My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014091
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HENRY
>
22469
>
2600 - Land Use Program
>
PA-0400250
>
SU0014091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2024 11:50:59 AM
Creation date
5/12/2021 2:18:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014091
PE
2656
FACILITY_NAME
PA-0400250
STREET_NUMBER
22469
Direction
S
STREET_NAME
HENRY
STREET_TYPE
RD
City
ESCALON
Zip
95320-
APN
24905017
ENTERED_DATE
4/22/2021 12:00:00 AM
SITE_LOCATION
22469 S HENRY RD
RECEIVED_DATE
10/27/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
methods approved by Development Services Division ) . <br /> ( 6 ) Fill Slopes . Fill slopes shall be constructed consistent with recommendations from a qualified <br /> civil/geotechnical engineer based upon site - specific geologic conditions . <br /> k . FENCING : Fencing four ( 4) feet in height consisting of not less than three ( 3 ) strands of barbed wire , <br /> or an approved equivalent , shall be placed around the excavation area where slopes steeper than two <br /> ( 2 ) feet horizontal to one ( 1 ) foot vertical are maintained . Six ( 6 ) foot high security fencing or an <br /> approved equivalent shall be required where slopes steeper than two ( 2 ) feet horizontal to one ( 1 ) foot <br /> vertical are created , if the proximity of such slopes to residential uses or other uses involving a <br /> concentration of people so warrants . ( Development Title Section 9 - 1415 . 3 [ 1] ) <br /> I . SCREENING AND LANDSCAPING : Screening consistent with Chapter 9 - 1020 is required . . <br /> ( Development Title Section 9 - 1415 . 3 [ m ] ) <br /> ( 1 ) A landscaped berm is required . Adequate setback for maintenance shall be required and sight <br /> distance at road intersections shall not be impaired . <br /> m . EXCAVATION / RECLAMATION SCHEDULE : The reclamation plan shall show the phases of <br /> excavation . Reclamation on one phase of an excavation shall be initiated prior to the start of the next <br /> excavation phase . The final reclamation of any phase of excavation shall be completed within two <br /> years of the commencement of the reclamation process . Excavation shall be limited so that at any <br /> point of time a maximum of one phase is being reclaimed while one phase is being excavated . <br /> ( Development Title Section 9 - 1415 . 3 [0] ) <br /> n . TIME LIMITATION : The Quarry Excavation Permit shall expire 2-6 49 years from the effective date of <br /> approval . <br /> o . ANNUAL INSPECTION REPORTS : Annual inspections of the excavation shall be conducted by the <br /> County to ensure compliance with the conditions of the permit and the reclamation plan . The County <br /> may use professional services as provided for in Section 9 - 240 . 11 . The consultant shall be selected <br /> by San Joaquin County . Upon completion of the annual inspection , the person in charge of the mining <br /> operation shall submit to the State Geologist and the County a report which shall contain all the <br /> information as required by Section 2207 of the Public Resources Code . The cost of the inspection <br /> shall be paid by the mine operator . Additional inspections may be conducted , but the cost of additional <br /> inspections shall be paid for by the mine operator only if non - compliance with the conditions of the <br /> Quarry Excavation Permit or the reclamation plan is found . ( Development Title Section 9 - 1415 . 3 [q] ) <br /> p . PERFORMANCE GUARANTEE : In order to ensure reclamation of the site , compliance with <br /> conditions of approval , and compliance with County and State mining regulations , the applicant shall <br /> provide performance guarantees as a condition of the issuance of the Quarry Excavation Permit . The <br /> amount and form of the guarantee shall be subject to annual review and approval by the County and <br /> the State , and the amount shall be adequate to ensure reclamation of disturbed land and/or land to be <br /> disturbed during a given phase . The annual review of the financial guarantee shall be coordinated <br /> with the annual inspection and approval of successive reclamation security so that the guarantee <br /> includes the amount of disturbed land plus the amount of land estimated to be disturbed during the <br /> next 12 months , less the amount of land previously determined by Development Services Division ' s <br /> annual inspection to have been reclaimed . The performance guarantee shall be in the form of either <br /> ( 1 ) a surety bond , ( 2) a trust fund with the lead agency , or ( 3 ) an irrevocable letter of credit . Any interest <br /> accrued in a trust fund shall stay with the trust fund account . The financial guarantee shall be payable <br /> to " San Joaquin County or the Department of Conservation " under the applicable provisions of the <br /> County and the State mining regulations . The financial guarantee shall be callable by the County or <br /> the State under the following circumstances : <br /> ( 1 ) The applicant causes the excavation to become idle ( as defined in Section 9 - 110 of the <br /> Development Title ) without an approved interim management plan ; <br /> PA- 0400250 — Conditions of Approval 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.