Laserfiche WebLink
c . A video tape of the planned haul route showing conditions of all County roads shall be prepared . The <br /> condition of San Joaquin County maintained roads along the haul route shall be reviewed with Public <br /> Works prior to the start of excavation . Any proposed changes to the haul route shall require a revision <br /> to the conditions of approval . ( Development Title Section 9 - 1415 . 2 ) <br /> d . Loads on all public roads shall be required to be legal loads only . ( Street and Highway Title Section <br /> 10 - 2350 ) <br /> e . An encroachment permit shall be required for work within the road right- of-way . ( Development Title <br /> Sections 9 - 1145 . 4 and 9 - 1145 . 5 ) <br /> f . The applicant shall construct a 150 - foot left-turn pocket for southbound Santa Fe Road at the <br /> project access point . <br /> g . All improvements shall be in conformance with the current Improvement Standards and Specifications <br /> of San Joaquin County . All improvement plans and specifications are subject to plan check and field <br /> inspection fees and must be approved by Public Works prior to the issuance of an encroachment <br /> permit . ( Development Title Section 9 - 1150 . 2 ) . <br /> h . Dedication to result in a 25400t wide right- of-way from the centerline of Hall Road to the property line <br /> shall be required across the frontage for APN 247 - 230 - 09 . ( Development Title Section 9 - 1150 . 5 ) <br /> i . A Maintenance Agreement to ensure that all roads designated as haul routes are maintained to a <br /> condition acceptable to San Joaquin County shall be executed by the applicant . In lieu of the <br /> maintenance agreement , a one -time road maintenance fee or an annualized maintenance fee may <br /> be acceptable to the County . Application for either of the indieu fees may be made to public works . <br /> j . The Traffic Impact Mitigation Fee may be required for this development . The fee is due and payable <br /> at the time of building permit application . The fee currently is $ 281 . 69 per trip- end in the Escalon area . <br /> The fee shall be automatically adjusted July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record . The number of trip - ends may be determined <br /> by a proportion to the length in time of the excavation operation . ( Resolution R - 96 - 592 ) <br /> k . Prior to the start of operations , the applicant must obtain coverage under the State National Pollutant <br /> Discharge Elimination System ( NPDES ) General Plan for Discharge of Stormwater associated with <br /> industrial activities by filing a Notice of Intent ( NOI ) to comply with the State Water Resources Control <br /> Board and developing a Storm Water Pollution Prevention Plan ( SWEPP ) ( Industrial ) <br /> 3 . ENVIRONMENTAL HEALTH DEPARTMENT ( Staff Contact : , [209] 468 - 3420 ) . <br /> a . No excavations are permitted into the ground water table without specific approval from the Regional <br /> Water Quality Control Board , Central Valley Region ( California Water Code , Chapter 4 , Article 3 , <br /> Section 13240 ) . <br /> b . The materials from an excavation shall not be deposited into any watercourse or in anyway contribute <br /> to the pollution thereof ( California Water Code , Section 13376 ) . <br /> c . An approved potable water supply must be provided for all employees ( Development Title Section 9 - <br /> 1100 . 1 ) . <br /> d . Approved sanitary facilities must be provided for all employees . ( Development Title Section 9 - 1100 . 1 ) <br /> PA- 0400250 — Conditions of Approval 5 <br />