My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013675_STAFF REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DELTA
>
7300
>
2600 - Land Use Program
>
PA-1800316
>
SU0013675_STAFF REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 4:06:51 PM
Creation date
5/13/2021 3:51:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
File Section
COMPLIANCE INFO
FileName_PostFix
STAFF REPORT
RECORD_ID
SU0013675
PE
2625
FACILITY_NAME
PA-1800316
STREET_NUMBER
7300
Direction
W
STREET_NAME
DELTA
STREET_TYPE
AVE
City
TRACY
Zip
95304-
APN
21302038, 21302041
ENTERED_DATE
10/6/2020 12:00:00 AM
SITE_LOCATION
7300 W DELTA AVE
RECEIVED_DATE
10/5/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
EHIntern
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PA-1800316(UP) Project -2- 17 January 2019 <br /> San Joaquin County <br /> Control Board(State Water Board), Office of Administrative Law(OAL)and in some cases, <br /> the United States Environmental Protection Agency(USEPA). Basin Plan amendments <br /> only become effective after they have been approved by the OAL and in some cases,the <br /> USEPA. Every three(3)years, a review of the Basin Plan is completed that assesses the <br /> appropriateness of existing standards and evaluates and prioritizes Basin Planning issues. <br /> For more information on the Water Quality Control Plan for the Sacramento and San <br /> Joaquin River Basins, please visit our website: <br /> http://www.waterboards.ca.gov/centralvalley/water issues/basi n_plans/ <br /> Antidegradation Considerations <br /> All wastewater discharges must comply with the Antidegradation Policy(State Water Board <br /> Resolution 68-16)and the Antidegradation Implementation Policy contained in the Basin <br /> Plan, The Antidegradation Implementation Policy is available on page 74 at: <br /> https:/lwww,waterboards.ca.g ov/centralvalley/water_issues/basin_plans/sacsjr_201805.pdf <br /> In part it states: <br /> Any discharge of waste to high quality waters must apply best practicable treatment or <br /> control not only to prevent a condition of pollution or nuisance from occurring, but also to <br /> maintain the highest water quality possible consistent with the maximum benefit to the <br /> people of the State. <br /> This information must be presented as an analysis of the impacts and potential impacts <br /> of the discharge on water quality, as measured by background concentrations and <br /> applicable water quality objectives. <br /> The antidegradation analysis is a mandatory element in the National Pollutant Discharge <br /> Elimination System and land discharge Waste Discharge Requirements(WDRs)permitting <br /> processes. The environmental review document should evaluate potential impacts to both <br /> surface and groundwater quality. <br /> II. Permitting Requirements <br /> Construction Storm Water General Permit <br /> Dischargers whose project disturb one or more acres of soil or where projects disturb less <br /> than one acre but are part of a larger common plan of development that in total disturbs <br /> one or more acres, are required to obtain coverage under the General Permit for Storm <br /> Water Discharges Associated with Construction Activities(Construction General Permit), <br /> Construction General Permit Order No.2009-009-DWQ. Construction activity subject to <br /> this permit includes clearing,grading, grubbing,disturbances to the ground, such as <br /> stockpiling, or excavation, but does not include regular maintenance activities performed to <br /> restore the original line, grade,or capacity of the facility. The Construction General Permit <br /> requires the development and implementation of a Storm Water Pollution Prevention Plan <br /> Planning Commission Staff Report, PA-1800316(UP) 43 <br /> Response Letters <br />
The URL can be used to link to this page
Your browser does not support the video tag.