Laserfiche WebLink
U.S.Department of Homeland Security <br /> FEMA Region IX <br /> I I 1 I Broadway,Suite 1200 <br /> Oakland,CA.94607-4052 <br /> r Ott\FA <br /> FEMA <br /> January 9,2020 <br /> Giuseppe Sanfilippo,Project Manager <br /> San Joaquin County <br /> Community Development Department <br /> 1810 E.Hawthorne Avenue <br /> Stockton,California 95205 <br /> Dear Mr. Sanfilippo: <br /> This is in response to your request for comments regarding Application Referral Early <br /> Consultation Application Number PA 1800316(UP),Use Permit application(APN/Address: <br /> 213-020-38,-41/7300 West Delta Avenue,Tracy)(Supervisorial District 5)dated December 31, <br /> 2019. <br /> Please review the current effective Flood Insurance Rate Maps(FIRMS)for the County of San <br /> Joaquin(Community Number 060299),Maps revised October 20,2016 and City of Tracy <br /> (Community Number 060303),Maps revised October 16,2009. Please note that the City of <br /> Tracy,San Joaquin County,California is a participant in the National Flood Insurance Program <br /> (NFIP). The minimum,basic NFIP floodplain management building requirements are described <br /> in Vol.44 Code of Federal Regulations(44 CFR),Sections 59 through 65. <br /> A summary of these NFIP floodplain management building requirements are as follows: <br /> • All buildings constructed within a riverine floodplain,(i.e.,Flood Zones A,AO,AH,AE, <br /> and Al through A30 as delineated on the FIRM),must be elevated so that the lowest <br /> floor is at or above the Base Flood Elevation level in accordance with the effective Flood <br /> Insurance Rate Map. <br /> • If the area of construction is located within a Regulatory Floodway as delineated on the <br /> FIRM,any development must not increase base flood elevation levels. The term <br /> development means any man-made change to improved or unimproved real estate, <br /> including but not limited to buildings,other structures,mining,dredging,filling, <br /> grading,paving,excavation or drilling operations,and storage of equipment or <br /> materials. A hydrologic and hydraulic analysis must be performed pnkor to the start of <br /> development,and must demonstrate that the development would not cause any rise in <br /> base flood levels. No rise is permitted within regulatory floodways. <br /> www.fema.gov <br /> Planning Commission Staff Report, PA-1800316(UP) 48 <br /> Response Letters <br />