Laserfiche WebLink
S J C O G, Inc. <br /> 555 Pas[Weber Avenue•Stockton,CA 95202•(209)235-Ob00•1'AX(209)239 0438 <br /> San Joaquin County Multi-Species Habitat Conservation&Open Space-Plan(SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION(RTLJ) <br /> AD'V'ISORY AGENCY NOTICE TO SJCOG,Inc. <br /> To: Giuseppe Sanfilippo,San Joaquin County,Community Development Department <br /> From: Laurel Boyd,SJCOG,Inc. <br /> Date: January 9,2019 <br /> Local Jurisdiction Project Title: PA-1800316(UP) <br /> Assessor Parcel Number(s): 213-020-38,-47 <br /> Local Jurisdiction Project Number: PA-1800316(UP) <br /> Total Acres to be converted from Open Space Use: Unknown <br /> Habitat Types to be Disturbed: Agricultural Habitat Land <br /> Species Impact Findings: Findings to be determined by SJMSCP biologist. <br /> Dear Mr.Sanfilippo: <br /> SJCOG,Inc.has reviewed the application referral for PA-1800316(UP). This project consists of a Use Permit application <br /> for a slaughterhouse and chicken farm in the Ag-40(General Agriculture,40-acre minimum)zone. The project includes <br /> the construction of a 4,000 square foot agricultural building to include a 1,600 square foot portion to be utilized as a <br /> slaughterhouse. The project also includes the construction of a 6,000 square foot chicken enclosure for a maximum of <br /> 600 chickens. Operations are planned for eight(8)hours a day,seven(7)days a week,and are expected to generate six <br /> (6)vehicle trips per day. The site will utilize a private well and septic system and be provided access from West Delta <br /> Avenue. The project site is on the south side of Delta Avenue,3,000 feet east of MacArthur Drive,Tracy(APNlAddress: <br /> 213-020-38,-4717300 West Delta Avenue,Tracy). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, <br /> and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental <br /> Quality Act(CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP,they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> This project is subject to the SJMSCP and is located within the unmapped land use area. Per requirements of the <br /> SJMSCP,unmapped projects are subject to case-by-case review,This can be a 90 day process and it is recommended <br /> that the project applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant <br /> obtain an information package. http://www,sjccg.org <br /> After this project is approved by the Habitat Technical Advisory Committee and the SJCOG Inc. Board, the following <br /> process must occur to participate in the SJMSCP: <br /> • Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground disturbance <br /> • SJMSCP Incidental take Minimization Measures and mitigation requirement: <br /> I. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by die project applicant prior to any <br /> ground disturbance but no later than six(6)months from receipt of the ITMMs.If ITMMs are not signed within six months,the applicant <br /> must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This <br /> is the effective date of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed ffMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered(the bond <br /> should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> a Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> Planning Commission Staff Report, PA-1800316(UP) 56 <br /> Response Letters <br />