My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013675_STAFF REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DELTA
>
7300
>
2600 - Land Use Program
>
PA-1800316
>
SU0013675_STAFF REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 4:06:51 PM
Creation date
5/13/2021 3:51:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
File Section
COMPLIANCE INFO
FileName_PostFix
STAFF REPORT
RECORD_ID
SU0013675
PE
2625
FACILITY_NAME
PA-1800316
STREET_NUMBER
7300
Direction
W
STREET_NAME
DELTA
STREET_TYPE
AVE
City
TRACY
Zip
95304-
APN
21302038, 21302041
ENTERED_DATE
10/6/2020 12:00:00 AM
SITE_LOCATION
7300 W DELTA AVE
RECEIVED_DATE
10/5/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
EHIntern
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31SJC0c, Inc. <br /> S JC0G,Inc. <br /> San,joaquin Cmrnp t11Ia 1ti-,V5ecies Habitat Conservation dam'Open,Space Plan <br /> 555 Fast Weber Avenue•Stocl<ton,CA 95202•(209)235-0600• FAX(209)235-0438 <br /> Fo SJMSCP HOLD <br /> TO: Local Jurisdiction: Community Development Department,Planning Department,Building <br /> Department, Engineering Department,SurveV Department,Transportation Department, <br /> Other: <br /> FROM: Laurel Boyd,SJCOG,Inc. <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi- <br /> Species Habitat Conservation and Open Space Plan(SJMSCP). In accordance with that agreement,the <br /> Applicant has agreed to: <br /> I) SJMSCP Incidental Take Minimization Measures and mitigation requirement. <br /> a 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the <br /> project applicant prior to any ground disturbance but no later than six(6)months from receipt of the ITMMs. <br /> If ITMMs arc not signed within six months,the applicant must reapply for SJMSCP Coverage. Upon receipt <br /> of signed ITMMs from project applicant,SJCOO,Inc.staff will sign the ITMMs. This is the effective date <br /> of the ITMMs. <br /> 1 Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs, <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered(the bond should he valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> c. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit,whichever occurs <br /> first,the project applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> b. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> c, Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> Project Title:PA-1800316(UP) <br /> Landowner/Applicant: Ahmed Hussein <br /> Assessor Parcel#s:213-020-38.-47 <br /> I ( � T R Section(s): <br /> 1, • <br /> Local Jurisdiction Contact:Giuseppe Sanfilippo <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> t Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP. <br /> Planning Commission Staff Report, PA-1800316(UP) 58 <br /> Response Letters <br />
The URL can be used to link to this page
Your browser does not support the video tag.