My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013675_STAFF REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DELTA
>
7300
>
2600 - Land Use Program
>
PA-1800316
>
SU0013675_STAFF REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 4:06:51 PM
Creation date
5/13/2021 3:51:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
File Section
COMPLIANCE INFO
FileName_PostFix
STAFF REPORT
RECORD_ID
SU0013675
PE
2625
FACILITY_NAME
PA-1800316
STREET_NUMBER
7300
Direction
W
STREET_NAME
DELTA
STREET_TYPE
AVE
City
TRACY
Zip
95304-
APN
21302038, 21302041
ENTERED_DATE
10/6/2020 12:00:00 AM
SITE_LOCATION
7300 W DELTA AVE
RECEIVED_DATE
10/5/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
EHIntern
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> & Electric Company <br /> 11. Cathodic Protection:PG&E pipelines are protected from corrosion with an"Impressed <br /> Current"cathodic protection system.Any proposed facilities,such as metal conduit, pipes, <br /> service lines,ground rods,anodes,wires,etc.that might affect the pipeline cathodic protection <br /> system must be reviewed and approved by PG&E Corrosion Engineering. <br /> 12. Pipeline Marker Signs: PG&E needs to maintain pipeline marker signs for gas <br /> transmission pipelines in order to ensure public awareness of the presence of the pipelines. <br /> With prior written approval from PG&E Pipeline Services,an existing PG&E pipeline marker sign <br /> that is in direct conflict with proposed developments may be temporarily relocated to <br /> accommodate construction work.The pipeline marker must be moved back once construction is <br /> complete. <br /> 13. PG&E is also the provider of distribution facilities throughout many of the areas within <br /> the state of California.Therefore,any plans that impact PG&E's facilities must be reviewed and <br /> approved by PG&E to ensure that no impact occurs which may endanger the safe operation of <br /> its facilities. <br /> PG&E Gas and Electric Facilities Page 4 <br /> Planning Commission Staff Report, PA-1800316(UP) 69 <br /> Response Letters <br />
The URL can be used to link to this page
Your browser does not support the video tag.