My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013675_STAFF REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DELTA
>
7300
>
2600 - Land Use Program
>
PA-1800316
>
SU0013675_STAFF REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 4:06:51 PM
Creation date
5/13/2021 3:51:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
File Section
COMPLIANCE INFO
FileName_PostFix
STAFF REPORT
RECORD_ID
SU0013675
PE
2625
FACILITY_NAME
PA-1800316
STREET_NUMBER
7300
Direction
W
STREET_NAME
DELTA
STREET_TYPE
AVE
City
TRACY
Zip
95304-
APN
21302038, 21302041
ENTERED_DATE
10/6/2020 12:00:00 AM
SITE_LOCATION
7300 W DELTA AVE
RECEIVED_DATE
10/5/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
EHIntern
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> Electric Company <br /> Waterjetting to assist vacuum excavating must be limited to 1000 psig and directed at a 40° <br /> angle to the pipe.All pile driving must be kept a minimum of 3 feet away. <br /> Any plans to expose and support a PG&E gas transmission pipeline across an open excavation <br /> need to be approved by PG&E Pipeline Services in writing PRIOR to performing the work. <br /> 6. BoringlTrenchless Installations: PG&E Pipeline Services must review and approve all <br /> plans to bore across or parallel to(within 10 feet)a gas transmission pipeline.There are <br /> stringent criteria to pothole the gas transmission facility at regular intervals for all parallel bore <br /> installations. <br /> For bore paths that cross gas transmission pipelines perpendicularly,the pipeline must be <br /> potholed a•minimum of 2 feet in the horizontal direction of the bore path and a minimum of 12 <br /> inches in the vertical direction from the bottom of the pipe with minimum clearances measured <br /> from the edge of the pipe in both directions.Standby personnel must watch the locator trace <br /> (and every ream pass)the path of the bore as it approaches the pipeline and visually monitor <br /> the pothole(with the exposed transmission pipe)as the bore traverses the pipeline to ensure <br /> adequate clearance with the pipeline.The pothole width must account for the inaccuracy of the <br /> locating equipment. <br /> 7. Substructures:All utility crossings of a gas pipeline should be made as close to <br /> perpendicular as feasible(90°+1-15°).All utility lines crossing the gas pipeline must have a <br /> minimum of 12 inches of separation from the gas pipeline. Parallel utilities,pole bases,water <br /> line'kicker blocks',storm drain inlets,water meters,valves, back pressure devices or other <br /> utility substructures are not allowed in the PG&E gas pipeline easement. <br /> If previously retired PG&E facilities are in conflict with proposed substructures,PG&E must <br /> verify they are safe prior to removal. This includes verification testing of the contents of the <br /> facilities,as well as environmental testing of the coating and internal surfaces. Timelines for <br /> PG&E completion of this verification will vary depending on the type and location of facilities in <br /> conflict. <br /> 8. Structures:No structures are to be built within the PG&E gas pipeline easement.This <br /> includes buildings,retaining walls,fences,decks,patios,carports,septic tanks,storage sheds, <br /> tanks,loading ramps,or any structure that could limit PG&E's ability to access its facilities. <br /> 9. Fencing:Permanent fencing is not allowed within PG&E easements except for <br /> perpendicular crossings which must include a 16 foot wide gate for vehicular access.Gates will <br /> be secured with PG&E corporation locks. <br /> 10. Landscaping: Landscaping must be designed to allow PG&E to access the pipeline for <br /> maintenance and not interfere with pipeline coatings or other cathodic protection systems. No <br /> trees,shrubs,brush,vines,and other vegetation may be planted within the easement area. <br /> Only those plants,ground covers,grasses,flowers,and low-growing plants that grow <br /> unsupported to a maximum of four feet(4')in height at maturity may be planted within the <br /> easement area. <br /> 11. Cathodic Protection:PG&E pipelines are protected from corrosion with an"Impressed <br /> Current'cathodic protection system.Any proposed facilities,such as metal conduit, pipes, <br /> PG&E Gas and Electric Facilities Page 3 <br /> Planning Commission Staff Report, PA-1800316(UP) 74 <br /> Response Letters <br />
The URL can be used to link to this page
Your browser does not support the video tag.