My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18846
>
3000 – Underground Injection Control Program
>
PR0546051
>
COMPLIANCE INFO_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:26 PM
Creation date
5/19/2021 9:59:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1
RECORD_ID
PR0546051
PE
3030
FACILITY_ID
FA0003883
FACILITY_NAME
VICTOR FINE FOODS
STREET_NUMBER
18846
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
01709051
CURRENT_STATUS
02
SITE_LOCATION
18846 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Continuous monitoring devices shall be installed and used to <br /> monitor temperature; injection pressure, flow rate, and volume; <br /> and the annular pressure and fluid volume between the tubing and <br /> the long string casing above the packer. <br /> 5. 'Automatic Alarms; Shut-Off Devices and' Operator Require- <br /> ments <br /> The permittee shall continuously operate and maintain an <br /> automatic warning system which will immediately notify the <br /> operators of a malfunction in the event that the injection pres- <br /> sure at the wellhead exceeds the maximum injection pressure <br /> authorized by this permit. This system shall be in operation at <br /> the time of commencement of injection. <br /> The permittee will extend the above described system to provide <br /> for automatic shut-down of the well in case of overpressure. <br /> This automatic shut-down system will be in operation no later <br /> than 90 days after commencement of injection,. <br /> A trained operator will be on duty during all hours when injec- <br /> tion is taking place. <br /> D. REPORTING REQUIREMENTS [§146. 13 (c) ] <br /> 1. Quarterly reports <br /> The permittee shall submit short and accurate quarterly reports <br /> to the Director containing the following information: <br /> (a) Results of the injection fluid analyses specified in <br /> permit condition Part II, Section C, Item 2 . <br /> (b) Daily and monthly average, as well as daily and monthly <br /> maximum and minimum values for the continuously monitored <br /> parameters specified in Part II, Section C, Item 3 . <br /> (c) Equipment calibration. <br /> (d) A narrative description of all non-compliance which oc- <br /> curred during the reporting period. <br /> 2 . Reports on Well Tests and Workovers [§146. 13 (c) (2) ] <br /> In the first quarterly report after the activity the permittee <br /> shall report to the Director the results of the following: <br /> (a) mechanical integrity tests; <br /> (b) other tests required by this permit; <br /> (c) any well workovers; and <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.