Laserfiche WebLink
7. Iniection Rate <br /> The injection rate shall not exceed 195 gpm at any time. <br /> 8. Annulus Measurements <br /> The annulus between the tubing and the long string casing shall be filled with treated <br /> fresh water to prevent corrosion and/or bacterial growth. A minimum surface annular <br /> pressure of 100 prig shall be maintained at all times. <br /> The permittee shall notify the Director in accordance with Part I, Section E, Item 12(d) of <br /> this permit when a change in the total annular fluid volume exceeds two (2) gallons at <br /> Standard Temperature and Pressure (STP). A volume adjustment in the annulus is con- <br /> sidered a physical alteration and is subject to the reporting requirements of Part I, Section <br /> E, Item 12(a). The total annular fluid volume range and the minimum annular pressure <br /> must be maintained unless a demonstration for suitable alternate values is submitted by the <br /> permittee and has been approved, in writing, by the Director. <br /> C. MONITORING REQUIREMENTS <br /> 1. Samnlina and Analytical Methods[144.5 1(j)(1) and <br /> 144.52(a)(5)] <br /> Samples and measurements taken for the purpose of monitoring shall be representative of <br /> the monitored activity. The method used to obtain a representative sample of the fluid to <br /> be analyzed and the procedure for analysis of the sample are as follows: <br /> (a) Grab samples shall be collected at the sampling valve at the wellhead and used <br /> for laboratory analysis for physical and chemical characteristics. <br /> (b) Temperature, annular pressure, and injection pressure shall be measured at the <br /> wellhead. <br /> (c) Injection rate/flow rate shall be measured in the supply line immediately before <br /> the wellhead. <br /> (d) All monitoring and recording equipment shall be calibrated on a regular basis. <br /> The permittee shall submit, to the Director, a report describing the calibration pro- <br /> cedures and the frequency at which the equipment will be calibrated. <br /> (e) The permittee shall submit, to the Director, a report identifying the types of <br /> tests and methods used to generate the monitoring data as specified by 40 CFR 136.3 <br /> or Appendix III of 40 CFR 261. When the analytical method for a particular <br /> parameter is not specified in either 40 CFR 136.3 or Appendix III of 40 CFR 261, <br /> the permittee must obtain EPA approval of the types of tests and methods used to <br /> generate the monitoring data. This report must be submitted for approval by EPA a <br /> minimum of thirty (30) days prior to collecting monitoring data for the first Quar- <br /> terly Report and any time the monitoring procedures are changed or modified for <br /> subsequent reporting periods. <br /> 12 <br />