Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 91-1 91-2 DIESEL <br /> Are both vent and tank riser piping r] Yes © Yes © Yes © Yes <br /> secondarily contained? ® No ® No ® No ® No <br /> OPE Model <br /> What is the OPE response when Shut off Shut off Q Shut off Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) © Restricts ORestricts © Restricts © Restricts <br /> Flow Flow Flow Flow <br /> © Audible 0 Audible 0 Audible rl Audible <br /> Alarm Alarm Alarm Alarm <br /> © Visual 0 Visual ❑t— Visual 57 Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping © Yes* r] Yes* r] Yes* © Yes* <br /> that may interfere with the OPE operation? 0 No ® No ® No © No <br /> At what level in the tank is the OPE set to <br /> activate? Inches from bottom of tank) 88.55% 94.76% 84.91 <br /> What is the percent capacity of the tank at <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to ® Yes ® Yes* © Yes* ® Yes* <br /> respond when the stored substance © No 0 No © No © No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ® Pass ® Pass ❑I� Pass ® Pass <br /> Q Fail ❑I— Fail © Fail 0 Fail <br /> 8. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> 91-2 THE OPE COULD NOT BE REMOVED AND TESTED AT THIS TIME DO TO THE BUCKET <br /> NIPPLE BEING RUSTED IN PLACE. THE BUCKET BASE SPUN WHEN TRYING TO REMOVE <br /> THE BUCKET NIPPLE. <br /> * Mark here if: <br /> 0 Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />