My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:18 PM
Creation date
5/19/2021 10:36:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> FACILITY EMPLOYEE TRAINING CERTIFICATE (Page 1 of 1) <br /> I. FACILITY INFORMATION <br /> Business Name(Same as Facility Name clr DBA-Doing Business As) ERS ID O' ic)� ' <br /> Bu ss City ZiPaode <br /> / II. DESIGNATED UNDERGROUND STORAGE TANK OPERATOR INFORMATION <br /> Name of Designated UST er or Pr viding the Training(Print as shown on the ICC Certification.) <br /> Mailing Address •- Phone# <br /> ICC CertjfMavl' � ICC Certification xpirati n Date <br /> C. <br /> III. FACILITY EMPLOYEE INFORMATION <br /> Individuals assuming the duties of the facility employee before October 13,2018 must be trained within 30 days of performing <br /> facility employee duties.Individuals assuming the duties of the facility employee on and after October 13,2018 must be trained <br /> before performing facility employee duties. <br /> E Check this box if a list of the individual(s)trained is appended to this form. The appended list,at a minimum,must contain <br /> all of the information in this section. <br /> Date of Assuming <br /> Name of Individual(s)Trained Initial Training Date Responsibility as a <br /> Facility Employee <br /> S I 3L 6 <br /> 617 <br /> ccl A►6 20 10 I <br /> , I <br /> a / ail <br /> �� IG <br /> IV. CERTIFICATION BY DESIGNATED UST OPERATOR CONDUCTING THIS TRAINING <br /> The facility employees listed above have completed the required training in accordance with California Code of Regulations, <br /> Title 23,Division 3,Chapter 16,Section 2715(c)and all the information provided herein is accurate. <br /> Training Design d US perator Si ature Date of Training <br /> CERS=California Environmental Reporting System,ID=Identification,ICC=International Code Council,UST=Underground Storage Tank <br />
The URL can be used to link to this page
Your browser does not support the video tag.