Laserfiche WebLink
r <br /> AUG 2 6 2021 * <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> i <br /> 1 <br /> (e) VEEDER ROOT CANISTER )� <br /> (e) VENT RISERS ti ; ' <br /> ANNULAR V FILRaPNULAR SPACE <br /> c SCOPE OF WORK : <br /> TK , �PJNLL <br /> 8 A TO MAKE THE REPAIRS TO THE 87191 TANK ANNULAR LEAKS DISCOVERED <br /> DEMO THIS SUMP RE-SEAL TOP OF TANK DURING THE RECENT HELIUM LEAK LOCATE ( LLOC ). <br /> NO WORK ON 12K O 4K AROUND THE BUNG THE LLOC FOUND TANK ANNULAR BREACHES IN THE 87 AND 91 TURBINE <br /> THISTANK OPENINGS TO SEAL SUMPS . <br /> K vAPOR ANNULAR LEAKS UST 87 & 91 TANK ANNULAR REPAIR <br /> ® 91 DEMO THIS SUMP 1 , LOCK OF TAG OUT ELECTRICAL TO 87 AND 91 UST <br /> 2 , SAW CUT AND DEMO 10 ' X 10' AREA AROUND TURBINE SUMPS TO <br /> 0 ACCOMMODATE NEW NOV PIPING PENETRATIONS FOR THE PRODUCT <br /> SUPPLY LINE , VAPOR RETURN , & VENT LINES <br /> W a. REMOVE ALL RISERS . PIPING , AND TURBINES IN BOTH SUMPS TO <br /> U' GAIN ACCESS TO THE TANK ANNULAR BREACHES <br /> H b. MAKE FIBERGLASS REPAIRS OF THE TANK ANNULAR LEAKS IN THE 87 <br /> Z AND 91 TURBINE SUMPS <br /> Q c. REMOVE ALL BLUE LINE PENETRATIONS AND SEAL HOLES WITH <br /> CANcaY0..' FIBERGLASS LAMINATION KITS <br /> a � 7 d . INSTALL NEW PENETRATION FITTINGS ON ALL PIPING AND <br /> zX rn ELECTRICAL FITTINGS IN BOTH SUMPS <br /> C-STORE 'I 2 3 . CALL FOR INSPECTIONS AS NECESSARY <br /> HWY 99 (a) DIPENSERS NO 4 . PERFORM SB989 RE-TESTING PER CUPA REQUIREMENTS <br /> lyt <br /> WORKTOBEDONE p NEW TURBINE 87 AND 91 UST <br /> Z <br /> 5 . INSTALL A NEW 2HP RED JACKET TURBINE ASSEMBLY IN THE 87 TURBINE <br /> SUMP <br /> 6 � <br /> 5� <br /> a. INSTALL NEW FLEX LINES AND PLUMBING AS NECESSARY <br /> i I <br /> = 6 . INSTALL A NEW 2HP RED JACKET TURBINE ASSEMBLY IN THE 91 TURBINE <br /> SUMP <br /> = a . INSTALL NEW FLEX LINES AND PLUMBING AS NECESSARY <br /> 7 , PURGE PRODUCT LINES <br /> 8 , PREFORM ALL REQUIRED SB 989 TESTING <br /> 9 , CALL FOR INSPECTIONS AS NECESSARY <br /> CONCRETE REPLACEMENT <br /> 10 . BACKFILL EXCAVATION WITH EXISTING PEA GRAVEL <br /> 11 . PLACE #4 REBAR ON CENTER EACH WAY <br /> STOCKTON CHEVRON <br /> N 10878 NORTH HIGHWAY 99 <br /> STOCKTON , CA 95212 <br /> DATE : 8-22-2021 SUMP REPAIR PG . 1 SCALE: <br /> AS NOTED <br /> ALL TECHNICIANS PERFORMING TESTS AND CERTIFICATIONS ARE �� + CCi CGRS , INC . <br /> INDIVIDUALLY CERTIFIED BY THE EQUIPMENT MANUFACTURERS AND HOLD 5444 DRY CREEK ROAD <br /> APPLICABLE INTERNATIONAL CODE COUNCIL (ICC) CERTIFICATES SACRAMENTO , CA . 95838 <br />