My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:18 PM
Creation date
5/19/2021 10:36:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Red Thread <br /> ( ProductD . <br /> Applications <br /> • Service Station • Central Fuel Oil Systems • Diesel Exhaust Fluid <br /> • Vent/VaporRecovery • Marinas Terminals • UL/ULC Systems that require MV, <br /> • Bulk NantTerminals • Ethanol Fuel Blends HB, CT, A&M Fuels <br /> • Fueling Terminals • Biodiesel Fuel <br /> Materials and Construction Fittings Joining System j <br /> All pipe ismanufactured byfilament Fittingsare manufactured with thesame <br /> winding process using amine-cured epoxy chemical and temperature capabilities as the <br /> • T. A . BT"' Theprimaryjoiningmethodfor <br /> thermosetting resin to impregnate strands of pipe. Depending on the configurations and pipejoints promoting fast, positive make- <br /> continuous glass filaments with a resin -rich size, the fittings construction method will up and prevents "backout" during curing. <br /> interior surface. The operating pressure be compression molded, contact molded, . Bell & Spigot - Theprimaryjoini ng <br /> of the pipe is up to 250psig (17.2bar) with fabricated orfilamentwound and are method for fitting joints. <br /> continuous operating temperature to 150°F described inFH1250. <br /> (660C). Thesejoints assistthe installerand assures <br /> Red Thread llAisListed with Underwriters Testing a fast trouble-free installation . Adhesive for <br /> Laboratories Standard 9712004for Installed pipe systems should betested prior this system is Series 8000. T.A. B. spigots can <br /> non-metallic underground piping for motor to use to assure soundness ofalljointsand be bonded into tapered bells and tapered <br /> vehicle (MV), high blend (HB), concentrated connections. Locate pressure gauge in close spigots can be Bonded into T.A. B. bells using <br /> (CT) and aviation and marine (A&M) fuels . proximity to the pressurizing equipment, standard bonding procedures fortapered <br /> The pipe and fittings are also Listed with not directlyon the pipingsystem . A pressure joints. <br /> Underwriters Laboratories of Canada with gaugewith thetest pressure at mid -scale is <br /> both Listings underFile MH9162. <br /> recommended . ASTM D2996 Designation Code - <br /> RTRP-11AW13110 <br /> Nominal Dimensional Data <br /> Pressure/ <br /> Pipe Size Inside Outside Wall Thickness Weight Temperature Mill Test Minimum <br /> Diameter Diameter Max . Rating at Pressure Bending Radius <br /> 150° F (660C) <br /> in mm in mm in mm in mm lbs/ft kg/m psig MPa psig MPa ft m <br /> 2 50 2.238 57 2.372 60 0.067 1.70 0.42 0.63 250 1.72 375 2.59 102 31. 0 <br /> 3 80 3.363 85 3.559 90 0.098 2.49 0.92 1 . 37 175 1.21 300 2.07 153 46. 5 <br /> 4 100 4.364 111 4.554 116 0.095 2.41 1.15 1.71 125 0.86 265 1.83 195 59 . 5 <br /> 6 150 6.408 163 6.686 170 0. 139 3.53 2.47 3 . 68 20 0.14 265 1.83 287 87.4 <br /> View of Joint Illustrations III <br /> goo- __ <br /> T. A . B . Bell & Spigot <br /> Fiber Glass Systems I C3 )y <br /> Completion nS Imflons fgspipe@nov. com nov. com/fgs <br />
The URL can be used to link to this page
Your browser does not support the video tag.