My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:18 PM
Creation date
5/19/2021 10:36:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: 5/26/2021 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> LINDERGRL_.._ _.cAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM(Page s ut s) <br /> Xyl. MONITORING SITE PLAN <br /> Date site map was DrePared. with your Monitoring System <br /> I/you already have a site plan that shows 611 required in/ormation,you <br /> may inGude R.rather then this page•) tank <br /> Cendication Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the ices mg equip <br /> ing Cant. <br /> if installed.' i)monitoring system control panels:2) n-tank liquid level Probes(d used!a leak detection),3)device�Pr�ilonng <br /> ring fillPiPing. <br /> an n lar spaces <br /> vapor recovery P pin958)devices rimonrtcormgpip'ventiransitions sumps:9)device monitoring under devices monitoring <br /> containment 10) <br /> line leak detectors:and 11)devices monitonng any other secondary containment areas. <br /> vfl <br /> Sfp <br /> z� rp <br /> 241 zeal <br /> fp OQ s P q q 004- 6z <br /> V^jr vr»S <br /> a A, <br /> C� C] <br /> LEGEND <br /> 1 <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.