Laserfiche WebLink
A. OBSERVATION <br /> gg B. gAN VIEW BIO-DIESEL SUMP <br /> RE J p <br /> .___... _ <br /> I S-1- <br /> NJ rl� <br /> U E. MANIFOTESTING SYSTEM <br /> CD c) : <br /> CONDUIT uS c r> <br /> NOTE:CON <br /> NOTE: REPLACE MANWAY SUPPLIED BYB <br /> ACK PCRODDUU CT. LINE TO PULL TANK MANUF=ACTURER WITH " <br /> BACK PM1 <br /> FEST BOOTS IN ALL 811 182 508 509 700 12 CUSTOM MANWAY SUPPLIED BY <br /> 1 --� 6" CLEAE;ANC(e SUMPS BIO-DIESEL BLENDER SYSTEM LIQUID FILLED <br /> 174 <br /> BETWEEN CAP& MANUFACTURER <br /> GRADE. VACUUM GAUGEGAUGE"� <br /> ^�, •.� _ '�"" 0_30" OF MERCURY <br /> 757 ` a� <br /> 754 ®gra 103 <br /> 2 81 1 <br /> 52 <br /> X106 <br /> II fig II VALVE. "A' — <br /> 353 �\ II VALVE "B" <br /> II II SS-4254 SWAGELOK SS-4254 SWAGELOK -- <br /> CONDL.JIT <br /> 4 I I PRODUCT LINE TO ='- = ^.,•.,._.,_._ _ _ <br /> _. <br /> r w <br /> [31_ENL"1E.R SUMP <br /> iI a C <br /> PEA GRAVEL., .-- <br /> u.. <br /> 171 FACTORY INSTALLED II „ a if it •__.•.•_ " COPPER TUBING uj <br /> MON RESERVOIR 510 .� �° � � _ � pl T-O MANIFOLD <br /> ""� ��"""" �. }�" COPPER TUBING .FO = <br /> C'RQPYt_E.NEGLYCOL AS 401 700 9 10 1( _._ _.__.._ _____ µm __. _ _........,. __.. __... SIPHON CARTRIDGE (f) v <br /> IN FLUID) ev <br /> 755 <br /> INSTALL TESD FIX FURE IN COPPER TUBEBE FWEEN 1 L-iE MANIFOLD LINE & SIPHON CARTRIDGE. <br /> n— 2, RUN THE SUBMERSIBLE WITH DISPENSER NOZZLES CLOSED & VALVE "A" CLOSED, VALVE "B" OPEN. THE NORMAL, VACUUM READING SHOULD BE <br /> v 15-2£3 NONE: HIGHER RVP FUELS AND/OR HIGHER FUEL TEMPERATURES CAN RESULT IN LOWER VACUUM READINGS. IF THE VACUUM IS LESS THAN <br /> ®`®� 15" THERE IS THE POSSIBILITY OF BLOCKAGE IN THE SIPHON PASSAGES (PLUGGED SIPHON PORT,PLUGGED/PINCHED RETURN TUBE). TO REMEDY, <br /> 756 CLEAN THE PASSAGES & REPLACE RETURN TUBE IF NECESSARY. IF THE PASSAGES ARE CLEAN & THE VACUUM READING IS ZERO OR VERY LOW, A <br /> 705 LEAK MAY BE PRESENT IN THE VACUUM SYSTEM, OR THERE IS A BLOCKAGE IN THE FLOW PATH TO THE SIPHON JET OR IN THE DISCHARGE TUBE, <br /> PULL THE EXTRACTABLE PORTION & REPAIR AS NECESSARY. <br /> - - 755 5 _ �'. �'' ;3. RUN THE SUBMERSIBLE WITH DISPENSER NOZZLES CLOSED & VALVE "A" CLOSED, VALVE "E3" OPEN. WHEN -THE VACUUM READING REACHES 15-2£3". <br /> ;� -• 800 . •� <br /> C, -- 755 r0o 9 10 14 SHUT THE PUMP OF=F & WAIT Two MINUTES. IF -THE READING DROPS TO ZERO, THE SIPHON CHECK VALVE IS NOT HOLDING. REMOVE & CLEAN OR <br /> 757 103 701 -VENT LINE REPLACE. NO f E: SIPHON CHECK VALVES MAY HOLD AT HIGH VAC;ULJMS, BUT LEAK UNDER LOWER VACUUMS TEST_1_HE SIPHON CHECK VALVE AT A <br /> LOWER VACUUM BY BLEEDING THE VACUUM TO ABOUT 5" Hg. & REPEAT THE TEST. <br /> C, 4, RUN THE SUBMERSIBLE WITH BOTH VALVES "A" & "B" OPEN & THE DISPENSER NOZZLES CLOSED FOR APPROXIMATELY 5-10 MINUTES, CLOSE VALVE <br /> < c "B" AND TF-IEN SHUT OFF PUMP. IF VACUUM DROPS, THERE IS A LEAK IN THE MANIFOLD LINE BETWEEN THE TANKS ABOVE THE LEVEL_ OF THE <br /> PRODUCT. REPAIR LEAKS & REPEAT STEP 4. <br /> 5, WRITTEN VERIFICATION OF TESTING INCA FORMANIFOLD SHALL BE SIGNED BY THE GENERAL._ CONTRACTOR RACfI OR & TANK INSTALLER. VERIFICATION SHALL- BE <br /> PROVIDED TO OWNER AS PART OF THE CLOSE OUT DOCUMENTS. <br /> ~' A ELEVATION <br /> FLUSH SURFACE MOUNT <br /> MANHOLE WITH <br /> CONCRETE CROWN 176 <br /> PVC CAP 1 3 4 C) <br /> SCREWED ON <br /> PEA GRAVEE_ LU <br /> 2 i) 4 n () <br /> CrJ <br /> F. MANWAY LID & SKIRT <br /> N <br /> 5r C/ D..E: 1-1l2 1''Q" « F x] <br /> NATIVE SOlI.. _ <br /> RESERVOIR (PROPYLENE 516 a <br /> GLYCOL AS INTERSTITIAL <br /> FLUID) 16 <br /> 81102- <br /> 00- <br /> 22 811 "" 816 <br /> Am z <br /> 816 103 <br /> 0 Fr <br /> 756 _ 1 176 ui <br /> LLj <br /> 705 <br /> PRODUCT <br /> LINE TO <br /> 7 - Eat DER <br /> 56 <br /> - r.. _ _. SUMP Q) <br /> • <br /> I N"�" MONITOR <br /> uj <br /> 401 700 9 10 13 <br /> 83 <br /> 353 _.._,_- -- _,......_.•,.- .__.,_._.. �.�....�...,..�.,. <br /> 1 73 1 '755 <br /> 11 <br /> 508 <br /> 816 ..__.._ <br /> 10 <br /> 4"X2" DOUBLE TAF' 157 182 508 509 700 12 <br /> BUSHING 756 <br /> 15 <br /> TEST <br /> P <br /> i <br /> FITTING gra <br /> 0 <br /> _._. CONDUITS TQ � ^ , <br /> ADJACENT UST z <br /> C <br /> IN FE RS FI TIAL " � r <br /> cU <br /> MONITORS < u' <br /> C.L. _ <br /> ui <br /> ILL <br /> LIST INSTALLATION NOTES- dc Nc <br /> E ' W B N <br /> > 0 (j) <br /> F _ <br /> m SO? 1. SLOPE CONCRETE AWAY FROM ALL MANE-POLES 1" ELISE OVER 12" RLJN .. � . p <br /> 43 � <br /> CONDW r HOME G�J ET <br /> L <br /> RUN FROM PUL.L- = ' m (YT c <br /> BRINE 2. JUNCTION BOXES IN TANK ,cUMP TO BE MOUNTED AS HIGH AS POSSIBLE INL.,1MP. CONDUIT& JUNCTION BOX FO BE OUTSIDE OF PERIMETER TE=R OF TANK ENTRY MANWAY. � • <br /> BOX <br /> CID <br /> 7 <br /> 3. REINFORCING BARS TO BE NO LESS THAN ? AND NO MORE THAN 4" FROM SURFACE. ���. ' C, <br /> U <br /> LLI <br /> RESERVOIR <br /> 00 CHLORIDE% CALCIUM --- 4. REINFORCE CONCRETE SLAB AROUND MANETOLE WITH (4) #4 REBAR 60'' IN LENGTH_ PLACE REBAR 6'' FROM SIDES OF BOX. <br /> > BRINE <br /> is SOLUTION) 5. PEA GRAVED_ BACKFILL ALL SUBSTITUTES MUST BE APPROVED BY MANUFACTURER AND OWNER'S FIELD REPRESENTATIVE 1 L u �. zo <br /> LLJ h. REAM AL..I_ RISERS FOR F=ULL PIPE BORE. i� �� <br /> r3 _... _ _ _ _......, <br /> 7 <br /> L <br /> 7. INSTALL TANK ID MARKERS IN THE.: SPILL CONTAINMENT MANHOLES AFFIX MANUFACTURER SUPPLIED MARKINGS TO FILL COVER. y <br /> pva „ l) <br /> E3. COAT-ALL BURI1:3D GALVANIZED STEEL WITH COAL TAR EPDXY/WRAP. <br /> F•Tl E 9. PIPING SHALL BE LAID AND CONTINUOUSLY SUPPORTED ON A 6'' COMPACTED PEA GRAVEL BEDDING. PIPING SHALL_ NOT BE SUPPORTED BY BLOCKS PLANKS CE-LER DEE3RDti�OR - <br /> }l , <br /> E <br /> gg kyr _J z,x <br /> '10. ALL ENTRIES -FO BE PERPENDICULAR TO CONTAINMENT SUMP, MAXIMUM 15 OFF LINE WHEN USING FLEXIBLE ENTRY BOOTS. S <br /> SCALE <br /> C � 11. PLYWOOD 48" X 48'' X 3/4" PLACED TO ASSURE 2" CLEARANCE BETWEEN CONCRETE AND CONTAINMENT SUMP. c 0" ¢ s 02 L""r <br /> 12.. 1�3" I._ONC3 2" DIAMETER -' SLEEVE � _. , _ SECURED., .. _ •�'r� � 7'F �W� DRAWN E3Y. <br /> m <br /> GLI <br /> METER FRP SLEEVE TO BE MOUNTED WITH UNIST RUT TO THE STP RISER & SECURED 2" OFF BOTTOM, SENSOR TO BE PLACED INSIDE OF FRP SLEEVE & REST ON THE BOTTOM OF rn <br /> 13. SLOPE PRODUCT PIPING BACK TO TANKS MINIMUM 1/4" [DER V-0" DATE <br /> : � 1/25/20`15 <br /> 7F <br /> 14. SLOPE TANK VENT PIPING TCS -RANKS MINIMUM 1l4" PER V-0". PRO,JECT NO.••, CA.-!098 <br /> co <br /> --- — ---' 15. INS FALL PERMANENT 1/4" BALL VALVE ON TIES F PORT TO BE USED TO TEST SUMP CONTINUITY. <br /> _...._ _.... _ .4 DRAVVING NO. <br /> 16. PNS-FALL PERMANENT LABELING TO SPECIFY THE USE OF BRINE OR PROPYLENE GLYCOL. LABEL SHALL BE ABLE TO WITHSTAND DEGRADATION & SHALL- BE PLACED IN AN OBVIOUS LOCATION. <br /> '71 <br />