Laserfiche WebLink
Explanation <br /> X Exploratory Soil Borings <br /> Temporary Wells (1992) <br /> Groundwater Monitoring Well <br /> (1992) <br /> AOdorizer <br /> -0.20 Groundwater Contour <br /> / Approximate Direction ofAk Groundwater Flow <br /> 0 25 50 feet \�C B-9 <br /> `(0.20) <br /> 0 <br /> N <br /> O <br /> Former B-3 <br /> \Reboiler Unit \ x (0.21) <br /> New <br /> Foundation <br /> B_4\ — Pads <br /> (0.18)x` MW-1 i <br /> Reboiler <br /> Discharge Line , B-2 <br /> X (0.19) <br /> i N, <br /> / B-5 <br /> (0.16) � <br /> X B-s / \ <br /> (0.17) B-s <br /> / 1 x (0.17) <br /> / 1 <br /> -6 <br /> 0p• Above Ground <br /> Production <br /> Odorant \� Fluids Tanks <br /> Storage 7 <br /> ( O <br /> Tanks x (0.15) <br /> Undine Road <br /> Figure 6. Groundwater elevation contour map on November 25, 1992 from temporary wells at <br /> PG&E's Lathrop Gas Dehydrator Station. <br /> 60007193/RAlTI-120A <br /> 6-4 <br />