My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WELTY
>
35275
>
2900 - Site Mitigation Program
>
PR0508042
>
SITE INFORMATION AND CORRESPONDENCE_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 4:29:38 PM
Creation date
5/19/2021 4:01:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 1
RECORD_ID
PR0508042
PE
2960
FACILITY_ID
FA0005316
FACILITY_NAME
U S CAN COMPANY
STREET_NUMBER
35275
Direction
S
STREET_NAME
WELTY
STREET_TYPE
RD
City
VERNALIS
Zip
95385
APN
25518009
CURRENT_STATUS
01
SITE_LOCATION
35275 S WELTY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M. Scott Mansholt - 2 - 8 May 2008 <br /> Chevron - US Can-Welty Ru-J <br /> Regional Water Board staff has the following comments: <br /> • Previously, by letter of 11 October 2007 we concurred that, since groundwater <br /> elevations had dropped and had been below the screened levels for some time, MW-3, <br /> 4, and 5 could be destroyed-, however, it appears that groundwater has recovered <br /> sufficiently to provide sufficient water for sampling of MW-3 and 4; <br /> • We concur that MW-4 and 5 should be destroyed (approved in our 11 October 2007 <br /> letter) and we concur that MW-3 should not be destroyed at this time and that <br /> groundwater monitoring and sampling should continue until an analytical trend is re- <br /> established; and, <br /> • The due date for the Additional Soil and Groundwater Investigation and Well <br /> Destruction workplan was revised due to site access issues. <br /> By 31 October 2008, please provide the results of the Soil and Groundwater Investigation and <br /> the details of destruction for MW-4 and 5. <br /> If you have any questions or comments, please contact Dean Hubbard at (559) 445-5179. <br /> S <br /> SHELTON R. GRAY C. DEAN HUBBARD <br /> Senior Engineering Geologist Engineering Geologist <br /> P.G. No. 6357 <br /> cc: Amy Terrell, RWQCB, Sacramento <br /> Harlan Knoll, San Joaquin County EHD, Stockton <br /> Norm Hunter, Kentfield <br /> Lee Higgins, SAIC, San Ramon <br /> Mike Jenkins, SAIC, Sacramento <br /> C DH/R\StaffC hevOVP\U SCan/Anu108GWrpt/8May08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.