Laserfiche WebLink
WAO <br /> ELEvEn <br /> Item 104: On your inspection report you noted that the site did not have a complete modified <br /> contingency plan posted at the facility. <br /> Resolution 104: The modified contingency plan was found to be posted and available for review <br /> during the DO training on 05/20/2021. <br /> This letter should address the item(s) noted on the Inspection Report. 7-Eleven assumes that all issues <br /> regarding this report have been resolved and are closed at this time. The submittal of this response by 7- <br /> Eleven,Inc. shall not constitute,nor be deemed to constitute,an admission of liability or responsibility with <br /> respect to the alleged violations and may not be used in any administrative or judicial proceeding or <br /> otherwise. <br /> Very truly yours, <br /> 7-Ele ,I <br /> Et Va urg <br /> Regional Gasoline Environmental Compliance Specialist <br /> Enclosures: Training Roster, Contingency plan,HMBP Site map <br /> cc: File <br /> 7-Eleven,Inc. <br /> P.O.Box 711—Dallas,Texas 75221-0711 <br />