Laserfiche WebLink
I <br /> The following is an itemized list of underground storage tank violations that have not <br /> been addressed for SINCLAIR/DINO MART as of July 19, 2021. <br /> Open violations from May 26, 2021 inspection <br /> Violation#122-Failure to implement corrections and submit written response within 30 days of receiving <br /> the report. <br /> OBSERVATION An inspection was last done on May 26, 2020 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance. This information was required to be submitted by <br /> June 25, 2020. This information has not been received resulting in a non-compliant status for this facility. <br /> REGULATION GUIDANCE: An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br /> all of the recommendations made in the report.The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an Inspection report. <br /> This violation was corrected ❑ This violation will be corrected by(date): <br /> Supporting documents Included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#203-Failure to maintain monitoring records for 36 months and maintenance records for 60 <br /> months. <br /> OBSERVATION Maintenance and monitoring records for the last three years were not found on site. The following <br /> documents were not located: <br /> -May 26, 2020 monitoring system certification <br /> -May 30, 2019 monitoring system certification <br /> -May 24, 2018 monitoring system certification <br /> REGULATION GUIDANCE These records shall be maintained on site for at least three years. Monitoring records <br /> include: (1)date and time of all monitoring or sampling; (2) monitoring equipment calibration and maintenance <br /> records; (3) results of any visual observations; (4) results of sample analysis performed a lab or in the field; (5) logs <br /> of all readings of gauges or other monitoring equipment, ground water elevations, or other test results; (6) results of <br /> inventory readings and reconciliations. <br /> CORRECTIVE ACTION: Immediately locate and maintain all missing maintenance and monitoring records for the j <br /> last three years on site and submit copies to the EHD. <br /> ❑ This violation was corrected This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> I <br /> I <br /> Page 3 of 8 <br />