My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0083481
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BOWMAN
>
76
>
4200/4300 - Liquid Waste/Water Well Permits
>
SR0083481
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:48:43 AM
Creation date
5/20/2021 1:07:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
SR0083481
PE
4201
STREET_NUMBER
76
Direction
W
STREET_NAME
BOWMAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19326019
ENTERED_DATE
3/30/2021 12:00:00 AM
SITE_LOCATION
76 W BOWMAN RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
EHIntern
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Health Department <br /> Q <br /> SANN-JOAQUIN <br /> " COUNTY Kasey Foley, REHS, Interim Director <br /> c �P PROGRAM COORDINATORS <br /> `c�Foa?� Greatness grows here. Robert McClellon,REHS <br /> Jeff Carruesco, REHS,RDI <br /> Willy Ng,REHS <br /> Muniappa Naidu,REHS <br /> Melissa Nissim,REHS <br /> Steven Shih, REHS <br /> April 27, 2021 <br /> Don Chesney, PE <br /> Chesney Consulting <br /> PO Box 3794, Turlock, CA 95381 <br /> RE: Onsite Wastewater Treatment System Design for Salvador Serna Property <br /> 76 W. Bowman Road, French Camp, CA 95231 <br /> APN: 193-260-19, SR0083481 <br /> The San Joaquin County Environmental Health Department (EHD) has received and reviewed <br /> the engineer designed septic system plan dated March 26, 2021 for above referenced location. <br /> The EHD concurs with the Engineer designed septic system for a three bedrooms Manufactured <br /> home with the following conditions: <br /> 1) Obtain Residential Engineer designed Septic System Permit prior to construction. An <br /> issued building permit is required prior to issuance of Septic System permit. A two-way <br /> clean out shall be installed between the building and the septic tank and every 100 feet at <br /> ground level. The fee will be based on the current schedule at the time of payment. The <br /> septic system shall be installed according to the approved engineer designed with the <br /> following requirements: <br /> a) Install a 2000-gallon septic tank with risers. <br /> b) Install Orenco Universal BioTube with dual Pump in the second compartment of the <br /> septic tank with audio and visual alarm. <br /> c) Install three 80ft long leach lines. <br /> d) The bottom of leach fields shall be at 24" below final grade. <br /> If you have any questions please contact Aldara Salinas, Environmental Health Specialist at <br /> asalinas@sjgov.org or at (209) 616-3019. <br /> Steven Shih, REHS <br /> Program Coordinator <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/ehd <br />
The URL can be used to link to this page
Your browser does not support the video tag.