Laserfiche WebLink
Material Specifications <br /> 1) HOOT Aerobic Treatment Unit: <br /> Use HOOT Model H600AND, capable of handling sewage flows of 600 gallons a day. <br /> 2) Effluent Pump: <br /> Franklin E-Series,Environmental Series, 110v,20 GPM mid-suction effluent pump. <br /> 3) Distribution System: <br /> All piping and fitting to be schedule 40 PVC,unless otherwise specified. All bends in pump line <br /> to be 45 degree elbows where possible. <br /> 4) Vortex Filter: <br /> Use a Netafin.,25AP25000101 Manufactured by ARKAL(Mesh 120, Micron 130)vortex filter. <br /> 5) Flush Valve Assembly: <br /> Use Geoflow Inc.,valves,air relief vents and poly box <br /> 6) Compression Adaptors and Tees: <br /> A tee and compression adaptor are required at each end of the drip line. Use 1 '/4"X 1 1/455 X ''/2" <br /> (SxSxS)tees. <br /> 7) Dripline: <br /> Use 1000 linear feet of Geoflow Inc., Wasteflow Pressure Compensating Dripline, (1/2"diameter <br /> line with emitters on 24"centers),part WFPC 16-2-24. <br /> 8) Vacuum Breaker: <br /> Install air/vacuum relief valves at the highest point on the inlet manifold and the flush manifold. <br /> Use Geoflow Inc., ARV 05 air/vacuum relief valves with tees and 6"diameter Carson box. <br /> 9) Spring Check Valve: <br /> Install on supply line,just before drip field supply manifold,to prevent drainage of supply line to <br /> drip field. <br /> 10)Check Valve: <br /> Install on return line,just after manifold, to prevent drainage of return line to drip field. <br /> Contact Numbers: <br /> HOOT Aerobic Treatment Unit Rick McCauley (916)747-4410 <br /> GeoFlow Inc. (800) 823-3388 <br /> HOOT AEROBIC TREATMENT SYSTEM INSTALLATION <br /> Refer to HOOT Installation Guidelines <br /> INSPECTIONS <br /> a) Preconstruction(Designer,Contractor/Installer,County Inspector) <br /> b) Flow/Squirt Test(Designer,Contractor/Installer,County Inspector) <br /> C) Cover(field inspection)(Designer, Contractor/Installer,County Inspector) <br />