Laserfiche WebLink
L & M OPERABLE UNIT-THIRD QUARTER 2014 SITE STATUS, REMEDIAL SUMMARY, AND <br /> GROUNDWATER MONITORING REPORT <br /> Appendix B <br /> Page 10 <br /> plan was submitted by Stantec dated January 17, 2014. In a letter dated April 7, <br /> 2014 the RWQCB-CVR requested submittal of a proposal to remove the existing <br /> SVE remedial equipment while leaving system piping, manifolds, and other <br /> infrastructure in place to allow for optimization to occur using a mobile <br /> treatment unit if necessary. Stantec submitted a Remediation Equipment <br /> Removal Proposal dated May 30, 2014. <br /> 5 5ta ntec <br />