My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
448
>
2900 - Site Mitigation Program
>
PR0009038
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 6:01:31 PM
Creation date
5/20/2021 2:19:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0009038
PE
2960
FACILITY_ID
FA0004035
FACILITY_NAME
STOCKTON REDEVELOPMENT AGENCY
STREET_NUMBER
448
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13726005
CURRENT_STATUS
02
SITE_LOCATION
448 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1874
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Evaluation of Hydrocarbons May 17, 1990 <br /> Waterfront Redevelopment, Stockton, California AGS 39048-2W <br /> Each sample collected will be promptly sealed with aluminum foil, plastic caps, and duct <br /> tape. The samples will be labeled and placed in iced storage for transport to the analytical <br /> laboratory for testing. Chain of Custody Records will be initiated by the geologist in the <br /> field and will accompany the samples to the laboratory. Copies of these records will be <br /> presented in our report. <br /> Cuttings generated during drilling will be stockpiled onsite in segregated piles on plastic <br /> sheeting and will be covered with plastic. This soil will be segregated into stockpiles based <br /> on OVM readings. Disposal of the soil will remain the responsibility of the City of <br /> Stockton. Applied GeoSystems can arrange to have the soil treated, if necessary, or can <br /> remove the soil to an appropriate disposal facility with the City of Stockton's authorization. <br /> Monitoring Well Construction <br /> Monitoring wells will be constructed in the 30-foot deep borings using 2-inch-inner- <br /> diameter, thread jointed, Schedule 40 polyvinyl chloride (PVC) casing. No chemical <br /> cements, glues, or solvents will be used in well construction. The slotted portion of each <br /> well will consist of factory-perforated casing with 0.020-inch-wide slots. The well screen will <br /> extend from total depth of the well to a point approximately 5 feet above first encountered <br /> ground water. This interval will allow sampling of water near the air-water interface in the <br /> wells, which is representative of the water in the formation during seasonal fluctuations of <br /> 11 <br /> A,nn/ied GeoSystems <br />
The URL can be used to link to this page
Your browser does not support the video tag.