Laserfiche WebLink
Project Number: SVE System Parcel 2A <br /> 211602385.500.0800 Field Data Sheet 666 West Weber Avenue <br /> Stockton, California <br /> Part A.Treatment System Information <br /> Soil Vapor Abatement Equipment: Solleco 750 TCAT Serial Number: M1422 <br /> Blower 1 (S-2): 10 HP Roots 56-250 acfm and 10 in Ho maximum <br /> Blower 2(S-3): 20 HP Roots 615-500 acfm and 10 in Ha maximum <br /> Telemetry: Autodialer <br /> Electrical Power: 400 Amo, 120/208 V. 3 Phase 4 Wire <br /> Supplemental Fuel: Natural Gas at 5 psi <br /> Part B: Permit Information <br /> Air Permit: San Joaquin Valley APCD Permit to Operate Number N-4878 <br /> Conditions: VOC control efficiency> 99% or VOC emmissions <2 lbs/day <br /> Minimum combustion temperature(thermal) 1,400 OF <br /> -Minimum combustion temperature (catalytic)600 OF <br /> Monthly effluent FID samples <br /> Collect continuous temperature readings onto floppy disk <br /> Part C: System Data <br /> Upon Arrival Upon Departure <br /> Date: e <br /> Time: ^JIdQ <br /> General Data Upon Arrival Upon Departure <br /> (S-2) System Status U /Down : �r/v,rl <br /> S-2 Hourmeter Reading: <br /> (S-3)System Status (Up/Down): ; UJ <br /> S-3 Hourmeter Reading: 12 <br /> Thermal Oxidizer Data Upon Arrival Upon Departure <br /> Oxidizer Setpoint *F): 6rj <br /> Operating Temperature: °F c <br /> High Temp Setpoint: (°F 0 <br /> Auto Dilution Set Point °F)61 eaw xe an F0 ZJ <br /> xKkzer Exhaust Temperature: `F) <br /> 1Soil Vapor Flow Data Before Adjustment After Adjustment <br /> (S-2)Temperature(°F); <br /> (S-2)Vacuum(mH2O): 66) <br /> S-2) Flow Rate scfm): <br /> (S-3)Temperature (°F): 717 <br /> (S-3)Vacuum (inH2O): 95 <br /> ,-(S-3) Flow Rate (scfm): <br /> FID Data Before Adjustment After Adjustment <br /> (S-2)Well Fieldv : <br /> S-2)Well Field With Carbon Ti (p my : <br /> S-3 Well Field mv): atx' <br /> (S-3)Well Field With Carbon Ti mv): ;�Z Zle <br /> Effluent(ppmy <br /> SV-Combined ( pmv): <br /> Completed By. Date: <br />