Laserfiche WebLink
Table 1 <br /> Monitoring and Sampling Plan <br /> South Shore Parcels-Parcel 2A and Adjacent Areas <br /> West Weber Avenue and North Lincoln Street <br /> Stockton,California <br /> MRP No.R5-2012-0805* Work Completed <br /> 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter During 3rd Quarter <br /> 2014 <br /> Monitor Monitor Monitor Monitor Monitor <br /> WeIII.D. DTW Sample DTW Sample DTW Sample DTW Sample DTW Sample <br /> C Zone Groundwater Monitoring Wells <br /> MW-54 1 1 1 1 1 1 1 1 1 1 <br /> MW-61 1 1 1 0 1 1 1 0 1 1 <br /> MW-62 1 1 1 1 1 1 1 1 1 1 <br /> MW-63 1 1 1 1 1 1 1 1 1 1 <br /> MW-64 1 1 1 1 1 1 1 1 1 1 <br /> MW-65 1 1 1 1 1 1 1 1 1 1 <br /> MW-66 1 1 1 1 1 1 1 1 1 1 <br /> MW-67 1 1 1 1 1 1 1 1 1 1 <br /> D Zone Groundwater Monitoring Wells <br /> MW-55 1 1 1 1 1 1 1 1 1 1 <br /> MW-68 1 1 1 1 1 1 1 1 1 1 <br /> MW-69 1 1 1 1 1 1 1 1 1 1 <br /> MW-70 1 1 1 1 1 1 1 1 1 1 <br /> MW-71 1 1 1 1 1 1 1 1 1 1 <br /> MW-72 1 1 1 1 1 1 1 1 1 1 <br /> MW-73 1 1 1 1 1 1 1 1 1 1 <br /> MW-74 1 1 1 1 1 1 1 1 1 1 <br /> Totals: 58 1 42 58 1 36 58 1 52 11 58 1 36 53 1 41 <br /> Explanations: <br /> DTW=Depth to Water <br /> MRP= Monitoring and Reporting Program <br /> MS=Mormon Slough <br /> M&S= Monitored and sampled <br /> QCDUP= Duplicate sample <br /> QTR=Quarter <br /> SPH=Separate-Phase Hydrocarbons <br /> --=Not applicable <br /> Dark shading indicates wells that were not monitored and/or sampled. <br /> Notes: <br /> MRP No. R5-2012-0805 replaces MRP No. R5-2004-0820,and was implemented during the third quarter 2012. <br /> Well 3MW-1 was destroyed and replacement well 3MW-1 R was installed by Clayton Group Services during the second quarter 2003. <br /> Wells MW-36, MW-38 and MW-39 were installed on April 10,2003. <br /> Well MW-37 was installed on May 9,2003. <br /> Wells DPE-8 through DPE-12 were installed during the third quarter 2003. <br /> Wells MW-40 through MW-46 installed by SECOR during the second quarter 2004. <br /> Wells MW-36 and 3MW-1 R were destroyed by Clayton on April 5,2004. <br /> Wells MW-47 through MW-55 were installed by SECOR during the second quarter 2005. <br /> Well DPE-13 was installed during the first quarter 2006. <br /> Well MW-34 was buried and damaged due to recent construction activities by the City of Stockton during 2Q06 <br /> Well MW-6 was destroyed by Golden State Environmental in June 2007. <br /> Well MW-06R was reinstalled in the vicinity of former MW-6 by Wallace Kuhl in November 2008; however, MW-6R was abandoned by <br /> Wallace Kuhl during the third quarter 2010. <br /> Well 2BMW-1 was abandoned by Wallace Kuhl during the second quarter 2010. <br /> V:\1857\active\tidewater\185750217_tidewater_stockton_p2a\05_report_del iv\drwgs_designs\tables\QMR Tables\2014\3Q14\M&S\Table 1,Table 2,Figure 9(Monitoring and Sampling Plan SPH vs.time)xlsRage 2 of 2 <br />