Laserfiche WebLink
GENESIS ENGINEERING 8 REDEVELOPMENT <br /> Table A-12 <br /> DePaoli Property <br /> Historic Analytical Data <br /> On-Site Soil Analytical Results <br /> Analysis of Title 22 Metals <br /> (1997) <br /> Sample Sample Depth Antimony Arsenic Barium Beryllium Cadmium Cobalt Chromium Copper Mercury Molybdenum Nickel Lead Thallium Selenium Silver Vanadium Zinc <br /> Location Sampling Date (feet) (mg/kg) (mg/kg) (mg/kg) (mg/kg) (mg&g) (mg/kg) (mg/kg) (mg/kg) (mg/kg) (mg/kg) (mg/kg) (mg/kg) (mg/kg) (mg/kg) (mg/kg) (mg/kg) (mg/kg) <br /> ERM-West,Inc. <br /> 6-1-S2 6/13/97 2 0.5 11.7 1560 0.2 <0.5 9 35 22.5 0.7 1.1 29.4 6.2 <2 <0.5 <0.1 57.8 44.2 <br /> B-1-S7 6/13/97 6-7 0.6 7.7 3290 0.3 <0.5 7.6 68.2 23.7 0.4 0.8 37.7 20.9 <2 <0.5 0.5 35.6 5 <br /> B-2-S2 6/13197 2 <0.5 9.7 4380 0.3 <0.5 8.2 28.4 24.3 NO 0.6 26.4 14.9 2.5 <0.5 <0.1 51 55.1 <br /> B-2-S7 6113/97 6-7 <0.5 4.4 407 0.3 <0.5 7.7 40.7 21.6 0.3 0.6 25.4 6.2 <2 <0.5 <0.1 42.1 44 <br /> B-3-S2 6/13/97 2 <0.5 6.2 3030 0.4 <0.5 6.7 28.8 26.3 NO 0.7 21.1 28.4 <2 <0.5 <0.1 51.1 53.3 <br /> B-3-S7 6/13/97 6-7 <0.5 6.2 6280 0.2 <0.5 4.2 38.1 15.5 0.1 0.6 20.1 9.3 <2 <0.5 0.1 29.9 75.6 <br /> 6-0-S2 6/13/97 2 <0.5 6.7 4740 0.3 <0.5 5.9 29.4 24.4 7.6 1.1 17.7 29.7 <2 <0.5 <0.1 40.6 50.5 <br /> B4-S7 6/13/97 6-7 <0.5 3.9 847 0.3 <0.5 7.5 75 22 NO 2.1 27.3 6.9 <2 <0.5 <0.1 42.1 39.2 <br /> B-5-S2 6/13/97 2 0.8 8.5 7530 0.3 <0.5 7 43.3 26.3 0.5 1 32.1 32.9 <2 <0.5 0.3 41.9 44.78 <br /> B-5-S7 6/13/97 6-7 0.5 4.5 114 0.3 <0.5 9.8 35 21.7 ND 1.1 30.3 10.1 <2 <0.5 <0.1 48.3 53.6 <br /> B-6-S2 6/13/97 2 <0.5 5.9 5890 0.3 <0.5 8.5 67.4 57.7 0.2 0.8 34.6 20.9 <2 <0.5 <0.1 56.9 60.8 <br /> B-6-S7 6113/97 6-7 <0.5 3.9 282 0.3 <0.5 8.8 41.4 27.8 ND 1.2 33.1 5.9 <2 <0.5 <0.1 54.2 53.6 <br /> 6-7-S2 6/13/97 2 4.5 75.5 6930 0.2 <0.5 3.5 162 66.1 1 6.7 2 16.5 162 1 <2 0.9 7.6 32.5 61.7 <br /> B-7-S7 6113197 6-7 <0.5 3.6 103 0.3 <0.5 6.9 29.4 21.4 NO <0.5 26.8 4.2 <2 <0.5 0.5 44.7 37.1 <br /> B-8-S2 6/13197 2 <0.5 1.8 4120 <0.2 <0.5 2.3 246 172 0.4 3 11 12.7 <2 <0.5 <0.1 33.9 30 <br /> B-8-S7 6/13197 6-7 <0.5 3 3510 <0.2 <0.5 0.7 2560 164 0.1 1.8 8.5 11.5 <2 <0.5 <O.1 39.7 15.7 <br /> 8-9-S2 6/13197 2 0.6 3.8 1850 0.2 <0.5 4.1 1440 244 0.2 7.2 17.4 69 <2 <0.5 0.5 33.7 30.5 <br /> 8-9-S7 6/13197 6-7 <0.5 2.2 4070 <0.2 <0.5 1.5 1120 220 ND 2.1 10.4 13.5 <2 <0.5 <0.1 74.2 19.6 <br /> 8-10-S2 6/16/97 2 <0.5 11.4 8870 0.4 <0.5 10 367 119 0.4 1.5 39.1 32.2 <2 <0.5 0.3 48.1 82.5 <br /> 8-10-S7 6/16/97 6-7 1 <0.5 8.4 3170 0.3 <0.5 7.1 234 20.2 NO 1.5 28.1 8.5 <2 <0.5 <0.1 39.7 136 <br /> 8-11-52 6/16197 2 1.3 15.6 8260 0.4 <0.5 7.7 153 32 0.8 1 30.6 52.5 1 2 0.7 0.7 43.8 77.3 <br /> B-11-S7 6/16/97 6-7 0.6 3.2 342 0.4 <0.5 7.5 48.1 22.8 ND 0.8 31.1 6.1 1 <2 <0.5 <0.1 55.3 57.6 <br /> Site Inve.Egab-Nbrk Plan <br /> Da P.&Property <br /> November 14,2007 1 Of 2 <br />