Laserfiche WebLink
Page 1 of 1 <br /> Margaret Lagorio [EH] <br /> From: Margaret Lagorio [EH] <br /> Sent: Monday, March 17, 2008 11:19 AM <br /> To: 'John Cooper' <br /> Subject: RE: DePaoli work plan and appendices <br /> 1 did a cursory review of the information and have questions comments. I want to make sure we have all the <br /> necessary information so the permits can be issued once the Regional Board approves the work plan. <br /> 1. Is Test America going to perform all the work, including the CPT and piezometers? 4e 5 <br /> 2. The Sampling and Analysis plan includes 4 off-site borings. These will require a separate permit, $89 <br /> fee and access agreement with property owner or encroachment permit if public right-of-way unless they are n <br /> DePaoli property. Once the locations are determined a location map must be submitted. WdAy �� � <br /> 3. The permit states the Reclamation District 2116 is the owner, county information shows �`�'e ao i so is this an a <br /> error? <br /> 4. The plan discusses installation of three piezometers. Once the locations are determined a location map and <br /> construction details must be sobmii:ted. A o I ermits rr ay b�e required ased on driller and location. <br /> 5 a r,-,,e- l o c�� eas S d e_ , �1 L tt,�.s-t e.� A <br /> Permits are issued to the C-57 licensed contractor per parcel/site. <br /> Margaret Lagorio,REHS <br /> Program Coordinator Unit IV <br /> 600 E.Main Street <br /> Stockton,CA 95202 <br /> (209)468-3449 <br /> From: John Cooper [mailto:jcooper@gercorp.com] <br /> Sent: Wednesday, March 12, 2008 4:50 PM <br /> To: Margaret Lagorio [EH] <br /> Subject: DePaoli work plan and appendices <br /> Ms. Lagorio <br /> Attached please find the work scope, appendices and figures for the DePaoli field investigation. <br /> Respectfully submitted, <br /> John D. Cooper <br /> Genesis Engineering & Redevelopement, LLC <br /> 209 599-2004 <br /> jcooper@gercorp.com <br /> 3/17/2008 <br />