My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
505
>
2300 - Underground Storage Tank Program
>
PR0231442
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2022 8:09:22 AM
Creation date
5/21/2021 8:40:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231442
PE
2361
FACILITY_ID
FA0006441
FACILITY_NAME
QUIK STOP MARKET #124
STREET_NUMBER
505
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
217-260-21
CURRENT_STATUS
01
SITE_LOCATION
505 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 89 91 <br /> Are both vent and tank riser piping M Yes © Yes r Yes 17 Yes <br /> secondarily contained? M No r] No R7 No E] No <br /> OPE Model oPw OPw oPw <br /> What is the OPE response when El Shut off Shut off ® Shut off 57 Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) ® Restricts ©Restricts ® Restricts 0 Restricts <br /> Flow Flow Flow Flow <br /> © Audible E Audible [M Audible r Audible <br /> Alarm Alarm Alarm Alarm <br /> ® Visual © Visual 0 Visual r Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping 0 Yes* ®✓ Yes* F1 Yes* rl Yes* <br /> that may interfere with the OPE operation? ® No ® No 8 No © No <br /> At what level in the tank is the OPE set to <br /> 89 3/4" 89 3/4" 89 3/4" <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at 95%° 95% 95% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to F] Yes Yes* 17 Yes* R7 Yes* <br /> respond when the stored substance n No No 17 No ® No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ® Pass © Pass © Pass Pass <br /> 0 Fail Fail © Fail Fail <br /> 8. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> * Mark here if: <br /> Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.