Laserfiche WebLink
COMMUNITY DEVELOPMENT DEPARTMENT <br /> USE PERMIT <br /> FILE NUMBER: <br /> (Attach additional sheets as necessary) <br /> See Chapter 9-1025 of the Develo ment Title for Performance Standard Re ulations <br /> Air Quality <br /> Describe air pollutants that may result from the project during construction: <br /> INo major air pollutants will result from the construction of the proposed project. No wine production operations take place on-site I <br /> Iand are not proposed within this permit. !� <br /> f <br /> I <br /> Noise <br /> Describe on-site sources of noise or vibration that may result from the proposed project: <br /> IThe proposed project will not result in a significant increase of noise. An acoustical study was generated for the project with f <br /> lamplified sound being considered.The results of the study determined that as long as we comply with the provided measures,the I <br /> Inoise levels will remain within the allowed limits. I <br /> IDescribe any machinery,equipment,or transportation noise that may result from proposed project: I <br /> INo heavy machinery or transportation of heavy machinery will occur on-site that could increase noise levels. No wine production <br /> Ioperations that would generate noise take place on-site and are not proposed within this permit. I <br /> I <br /> Light and Glare <br /> Describe any on-site sources of light and/or glare that may result from the proposed project: <br /> IProposed lighting required for the facility will be directed towards the property and within the allowed brightness to limit possible <br /> I impacts of light pollution and glare off-site. <br /> Odor <br /> Describe any on-site source of odor that may result from the proposed project: <br /> INo on-site source of odor shall result from the proposed project site. There will be no wine production operations on-site as part of this I <br /> Ipermit that could generate a new source of odor.The wine sold as part of the project is made from the grapes grown on-site—but is processed offsite. I <br /> I <br /> I <br /> I <br /> Updated 09/01/2020 <br />