Laserfiche WebLink
ATTACHMENT B: <br /> PERMITTING,ACCESS,AND SAFETY PROCEDURES <br /> To maintain regulatory and legal compliance,protect the health of all involved persons, <br /> and prevent accidents, SAIC Energy, Environment& Infrastructure, LLC: <br /> • Completed strategic-planning and project-setup activities, including the site- <br /> specific Health and Safety Plan, site-specific Journey Management Plan, and the <br /> clearance of subsurface utilities. <br /> • Determined the ownership of, and obtained access to,private properties on which <br /> borings were to be located. <br /> • Conducted a site visit to mark boring locations for Underground Service Alert <br /> (USA), notified USA at least 48 hours in advance of field activities, and requested <br /> USA to mark underground utilities in public right-of-way(ROW). <br /> • Obtained soil boring permits from the San Joaquin County Environmental Health <br /> Department. <br /> • Obtained an encroachment permit from the California Department of <br /> Transportation(Caltrans)to advance soil borings in the Highway 33 ROW. <br /> • Subcontracted Cruz Brothers Locators, a private utility locator,to clear the site <br /> and proposed boring locations for any potential overhead and underground <br /> hazards and/or other potential obstacles. <br /> • Subcontracted Statewide Safety and Signs to prepare a traffic control plan and <br /> provide traffic control countermeasures while performing work in the Highway 33 <br /> ROW. <br />