Laserfiche WebLink
1011-6SV-0285 <br /> June 27,2011 <br /> Page 2 of 4 <br /> Box 2048, Stockton, CA 95201, (209) 948-3656. All work requiring traffic control <br /> must apply for a closure number seven days prior to start of work. No closures <br /> 1 <br /> on HOLIDAYS or WEEKENDS. <br /> Failure on the Permittee's part to comply with any provision will be cause for revocation <br /> of this permit. <br /> IMMEDIATELY FOLLOWING COMPLETION OF WORK PERMITTED HEREIN, PERMITTEE SHALL FILL <br /> OUT AND MAIL NOTICE OF COMPLETION PROVIDED BY GRANTOR, <br /> a <br /> Permittee's attention is directed to Section 6, "CONTROL OF MATERIALS", of the State <br /> Standard Specifications Reference to Engineer in the State Standard Specifications <br /> shall include State Representative. <br /> Permittee is directed to Standard Specification section 7-1.11 Preservation of Property, <br /> and Business and Professions Code, Section 8771. Permittee shall physically inspect <br /> the work site and locate survey monuments prior to work commencement. Monuments <br /> shall be referenced or reset in accordance with Business and Professions Code. <br /> Notwithstanding General Provision #4, your contractor is re uired to apply for and <br /> q <br /> obtain an encroachment permit prior to start of work. <br /> A pre job conference with the Permittee, Contractor, and State Representative may be <br /> required prior to start of work. Permittee shall contact the State Representative and <br /> arrange the meeting. This meeting may be waived at the discretion of the State <br /> Representative. <br /> Permittee shall, prior to commencement of any work provide the State Representative <br /> . p p <br /> with the name and phone number of the person in responsible charge of the work to <br /> be performed under this permit. <br /> Traffic control shall be done in conformance with California Manual on Uniform <br /> Traffic Control Devices 2010. <br /> Perm itteelcontractor shall work with the State representative to request the <br /> necessary lane closure needed. Request shall be the week prior to the actual <br /> work. The State representative shall submit closure through the Lane Closure <br /> System (LCS) for Traffic Management Center (TMC) approval by Wednesday <br /> afternoon of the week prior. <br /> All Lane closures shall be called in by either the contractor to the TMC when the <br /> closure begins (10-97), ends (10-98), or is cancelled (10-22). The TMC can be <br /> reached (24-7) at (209) 948-7556 or 7551. <br /> Before commencing work, Permittee must obtain written concurrence from the State <br /> Highway Resident Engineer on the scheduling of the proposed work. <br /> Compaction of backfill material by ponding or jetting will not be permitted. <br /> 2 <br />