Laserfiche WebLink
1011-6SV-0285 <br /> June 27,2011 <br /> Page 4 of 4 <br /> 4. Unless specifically authorized in this permit, markings within the right of way shall be <br /> temporary. Paint used for markings shall be water-soluble and other markers shall <br /> be removed upon completion of work. <br /> 5. Any collected data requested by Caltrans shall be furnished to Caltrans without <br /> charge. <br /> 6. Vehicles necessary for work may be parked in State Highway right of way off paved <br /> shoulders. Auxiliary support and employee vehicles shall remain outside the right of <br /> way. <br /> 7. Permittee shall provide for the safe passage of pedestrians. <br /> 8. THIS PERMIT AUTHORIZES WORK ON CONVENTIONAL HIGHWAYS ONLY. <br /> The State of California, Department of Transportation makes no assurance or <br /> expressed warranty that the plans are complete or that the planned construction fits <br /> field conditions. Should additional work or modifications of the work be required in order <br /> to meet established Department Standards or in order to fit field conditions, the work <br /> shall be performed by Permittee as directed by the State's Inspector. <br /> Permittee shall fully conform to the requirements of the Caltrans statewide NPDES <br /> Storm Water Permit, Order No. 99-06-DWQ, NPDES No. CAS000003, adopted by <br /> the State Water Resources Control Board on July 15, 1999. The Permittee shall <br /> also conform to the requirements of the General NPDES Permit for construction <br /> Activities and any subsequent General Permit in effect at the time of issuance of this <br /> Encroachment Permit. These permits regulate storm water discharges associated with <br /> year-round construction or special event encroachment activities. <br /> For all projects of 1 acre or more the Permittee shall develop, implement, and maintain <br /> a Storm Water Pollution Plan (SWPP) and for projects less than 1 acre a Water <br /> Pollution Control Program (WPCP). Either the Plan or Program shall also conform to <br /> I the requirements of the Caltrans Storm Water Quality Handbook, Construction <br /> Contractor's Guide and Specifications and Caltrans Specification Section 7-1-.01G and <br /> subsequent revisions. <br /> 4 <br />