My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WELTY
>
35500
>
2900 - Site Mitigation Program
>
PR0508043
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2021 11:22:43 AM
Creation date
5/24/2021 11:13:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508043
PE
2960
FACILITY_ID
FA0007905
FACILITY_NAME
CHEVRON PIPELINES
STREET_NUMBER
35500
STREET_NAME
WELTY
STREET_TYPE
RD
City
VERNALIS
Zip
95385
APN
25526003
CURRENT_STATUS
01
SITE_LOCATION
35500 WELTY RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHEVRON EMC 9258420213 05/20 '0:;' 07:57 NO.554 01/02 <br /> Chevron Environmental Robert,D.Mihalovich <br /> Management Company Pipeline Program Manager <br /> Property Management <br /> 6001 Bollinger Canyon Road <br /> P.O.Box 6012 <br /> San Ramon.CA 94583-071.2 <br /> Tel(925)842-1341 <br /> fax(925)842-0213 <br /> May 17,2002 Chevroffexaco <br /> FACSIMILE TRANSMISSION <br /> (91.6)255-301.5 <br /> Total Pages=2 <br /> Ms.Amy Terrell <br /> California Regional Water Quality Control Board, <br /> Central Valley Region <br /> 3443 Routier Road,Suite A <br /> Sacramento,California.95827-3003 <br /> Amendments to April 11.3,2002 <br /> Soil and Groundwater Sampling Work Plan <br /> Roberts Property(Former Vernalis Pump Station) <br /> 35500 Welty Road <br /> Vernalis,California <br /> Dear Ms.Terrell: <br /> Per your email and telephone conversations with Penny Fottrel.l of.Geomatrix Consultants,Inc, <br /> (Geomatrix),it is Chevron Environmental.Management Company's understanding that the subject <br /> work plan is approved with the following amendments_ <br /> ♦ The grab groundwater sample from boring SB-l3 will be analyzed for TPHd. <br /> ♦ An.a.dd.idona.l.boring(SB-1.4•)will be advanced downgra.dient of monitoring well MW-2 within <br /> the subject property boundary(see modified Figure 4,attached). The actual location of this <br /> boring will be based on Held.conditions. Proposed sampling intervals,procedures,and analysis <br /> will be the same as that for boring SB-1.3. <br /> ♦ If measurable free product is present in monitoring well MW-1 during implementation of the <br /> April 2002 work plan,product removal will be performed during upcoming quarterly product <br /> removal activities in the area.. These removal activities are scheduled to take place in July. <br /> Thank you.for your consideration. If you have any questions or require additional information,please <br /> call Penny Fottrell.at(925) 841-1343 or me at(925) 842-1341. <br /> Sincer , <br /> rt D.Mihalovich <br /> Attachment: modified.Figure 4 showing boring SB-14 <br /> cc: Mr.. Harlan Knoll,San Joaquin County Public Health Services:(209)468-3433 <br /> Mr.Martin Bl.oes,Geomatrix- (510) 663-4141 <br /> Mr. Arnold.and.Ms. Doreen Bellini: US Mail <br />
The URL can be used to link to this page
Your browser does not support the video tag.