Laserfiche WebLink
Mr.M. Scott Mansholt—CEMC <br /> First Semi-Annual 2008 Groundwater Monitoring and Sampling Report April 28,2008 <br /> Vernalis Pump Station Page 6 of 6 <br /> CLOSING <br /> If you have any questions regarding this report,please call Tom Burns at(916) 979-3748. <br /> Sincerely, <br /> SCIENCE APPLICATIONS INTERNATIONAL CORPORATION <br /> f' <br /> Alejandra Hernandez Tom Burns, P.G. <br /> Staff Geologist Principal Geologist 5o N A j G <br /> �S FO <br /> Enclosures Q:) Eo y <br /> THOMAS <br /> on <br /> Figure 1: Vicinity Map BURNS�� <br /> o P `loe <br /> Figure 2: Site Map No. 8053 <br /> Figure 3: Potentiometric Surface Map—January 2008 <br /> Figure 4: Potentiometric Surface Map—August 2007 FOF CA'L\ � <br /> Figure 5: Petroleum Distribution in Groundwater—January 2008 <br /> Figure 6: Petroleum Distribution in Groundwater—October 2007 <br /> Table 1: Groundwater Elevation Data and SPO Thickness Measurements <br /> Table 2: Groundwater Analytical Results (TPH,BTEX, and MTBE) <br /> Table 3: Groundwater Analytical Results (PAHs) <br /> Table 4: Monitoring Well Construction Details <br /> Attachment A: Field Data Sheets <br /> Attachment B: Data Usability Summary and Laboratory Analytical Report(January 2008 and October <br /> 2007 Data) <br />