My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WELTY
>
35500
>
2900 - Site Mitigation Program
>
PR0508043
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2021 7:04:54 PM
Creation date
5/24/2021 11:28:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508043
PE
2960
FACILITY_ID
FA0007905
FACILITY_NAME
CHEVRON PIPELINES
STREET_NUMBER
35500
STREET_NAME
WELTY
STREET_TYPE
RD
City
VERNALIS
Zip
95385
APN
25526003
CURRENT_STATUS
01
SITE_LOCATION
35500 WELTY RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1915
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. M. Scott Mansholt–CEMC <br /> First Quarter 2007 Groundwater Monitoring and Sampling Report April 24,2007 <br /> Vernalis Pump Station Page 5 of 5 <br /> fluctuated between non-detect levels to 930 jig/L; the current concentrations appear stable within the <br /> range of fluctuation. PAHs remained stable at low concentrations. These constituents have been <br /> monitored since 1998 and SPO has been observed in well MW-1 since 1998. <br /> The site consists of two properties: the Bellini and Arcos properties. Investigative activities on these <br /> properties are essentially complete. Hydraulically down gradient of the former pump station is the <br /> Bogetti property, where additional groundwater investigation is required. As of the second quarter of <br /> 2007, the Bogetti property is a separate sitereferred to as Vernalis Offsite—as accepted by the RWQCB <br /> in a letter dated February, 13, 2007. <br /> SAIC will continue quarterly monitoring at the site as recommended in the RWQCB letter dated <br /> September 20,2006. The oleophilic sock in well MW-1 will be monitored quarterly and replaced as <br /> necessary. SAIC recommends over-purging SPO and then collecting a sample from well MW-1. MW-I <br /> has contained a sheen since 2005; over-purging may remove the residual hydrocarbons desorbing from <br /> the soil surrounding the well. <br /> CLOSING <br /> If you have any questions regarding this report,please call Chris Dennis at(916) 979-3866. <br /> Sincerely, <br /> SCIENCE APPLICATIONS INTERNATIONAL CORPORATION <br /> O <br /> Daniel Anze on 0 �Christopher B. Dennis P.G. p Gy <br /> p CHRISTOPHER <br /> Staff Geologist Senior Geologist a B. <br /> DENNIS <br /> Enclosures No.7184 �Q <br /> Figure 1: Vicinity Map �� <br /> Figure 2: Site Map OP <br /> Figure 3: Potentiometric Surface Map–First Quarter 2007 <br /> Figure 4: Petroleum Distribution in Groundwater Expires August 3t Z."k'"7 <br /> Table 1: Groundwater Elevation Data and SPO Thickness Measurements <br /> Table 2: Groundwater Analytical Results----TPHd <br /> Table 3: Groundwater Analytical Results–PAHs <br /> Attachment A: Field Data Sheets <br /> Attachment B: Data Usability Summary and Laboratory Analytical Report <br /> Attachment C: General Minerals Analysis Table and Trilinear Diagram <br />
The URL can be used to link to this page
Your browser does not support the video tag.