Laserfiche WebLink
- 5 - <br /> PA - 2000017 ( GP ) , - 218 ( SU ) , PA- 2200021 (ZR ) & - 070 (WC ) <br /> 22 ) Prior to issuance of building permit , the Project shall submit a Letter of Map Revision <br /> ( including certified as - built drawings ) to FEMA to remove the Project from the Special Flood <br /> Hazard Area . <br /> 23 ) This project is subject to the NPDES Region -Wide Permit requirements and shall comply <br /> with the following conditions . Prior to release of the grading permit , plans and calculations <br /> shall be submitted and approved by the Public Works Department — Water Resources <br /> Division ( 209468 - 3605 ) : <br /> a ) Treatment : A registered professional engineer shall design the site to treat the 85th <br /> percentile storm as defined in the County ' s 2023 Storm Water Quality Control <br /> Criteria Plan ( SWQCCP ) . <br /> b ) Hydromodification : A registered professional engineer shall design the site to <br /> comply with the volume reduction requirement outlined in the County ' s 2023 <br /> SWQCCP . <br /> c) Trash : A registered professional engineer shall design the site to comply with the <br /> trash control requirement outlined in the County ' s 2023 SWQCCP . <br /> 24 ) Applicant shall file a Notice of Intent ( NOI ) with the State Water Resources Control Board <br /> ( SWRCB ) and comply with the State " General Permit for Storm Water Discharges <br /> Associated with Construction Activity " . The Waste Discharge Identification Number (WDID ) , <br /> issued by SWRCB , shall be submitted to Public Works prior to release of the grading <br /> permit . Contact the SWRCB at ( 916 ) 341 - 5537 for further information . <br /> 25 ) Prior to release of the grading permit the applicant shall submit the Storm Water Pollution <br /> Prevention Plan ( SWPPP ) to Public Works . A copy of the approved SWPPP and all <br /> required records , updates , test results and inspection reports shall be maintained on the <br /> construction site and be available for review upon request . <br /> 26 ) Prior to release of the building permit , the owner shall enter into an agreement with San <br /> Joaquin County for post- construction maintenance of stormwater quality facilities . <br /> Informational Notes : <br /> ( i . ) The Project shall demonstrate no adverse flooding impacts to neighboring parcels . <br /> ( ii . ) All future building permits for projects located within a Special Flood Hazard Area at the <br /> time of permit issuance shall meet the San Joaquin County flood hazard reduction <br /> requirements (Title 9 , Chapter 9 - 1605 ) and all requirements of the State of California <br /> ( CCR Title 23 ) that are in force at the time of permit issuance . As an example , these <br /> requirements may include raising the finish floor elevation one foot above the expected <br /> flood level and /or using flood resistant materials . Building pads must be designed and <br /> constructed 1400t above the post- project BFE . <br /> ( iii . ) This property is subject to the requirements of San Joaquin County Mosquito & Vector <br /> Control District ( 209 - 982 -4675 ) and the California Health and Safety Code for the <br /> prevention of mosquitoes . Best Management Practices ( BMP ) guidelines for stormwater <br /> devices , ponds and wetlands are available . <br /> ( iv . ) Wastewater shall NOT be allowed into the storm drainage system . <br />