Laserfiche WebLink
Harney Lane Landfill 30 April 2008 <br /> In light of the detections reported during the P quarter 2008 event, staff recommends the <br /> Discharger install the additional LFG wells in the vicinity of well MW-2 as approved, with the <br /> possibility of expanding the system in the vicinity of compliance well MW-4 to capture LFG <br /> where VOCs have been detected. Installation of the LFG wells should commence and be <br /> operational by 1 September 2009. <br /> The monitoring and reporting checklist is attached for your review. If there are any questions <br /> please call me at°(916)-464-4737. <br /> 3e <br /> 4 <br /> ODD AFDELFRATE, PG <br /> Engineering Geologist <br /> Title 27 Enforcement <br /> Enclosure(s) Monitoring and Reporting Checklist <br /> cc: Robert McClellon, Environmental Health Department <br />