My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 11:39:55 AM
Creation date
5/25/2021 11:23:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008-2009
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Todd Del Frate -2- <br /> WELL INSTALLATION WORK PLA ARNEY LANE SANITARY LANDFILL <br /> Table 1 <br /> Reference Sampling Points <br /> Reference Location Distance from Location CO2 Concentration <br /> Landfill (Feet) (1) <br /> SG-12 1,800 Foothill Landfill 0.0 to 0.3% <br /> SG-9 1,800 North County Landfill 0.6% to 0.8% <br /> Grassland Road 2,250 Grassland Road To be measured by <br /> push-probe sample <br /> (1) See attached data from SCS Engineers <br /> Intermediate soil gas sampling intervals are selected because the drive probe can extend to a <br /> depth sampled by these soil gas intervals. <br /> Schedule <br /> The following schedule is based on verification that the proposed location for MW-6 will be <br /> acceptable. <br /> EVENT TIME FRAME <br /> Approval of this Installation Work Plan 0 <br /> Completing drive-probe sampling 3 weeks <br /> Preparation of push-probe report to RWQCB staff 1 week <br /> Review of push-probe report and approval to proceed TBD <br /> Preparation of well permit and work plan (submit to EHD) (1) 1 week <br /> Review of application and issuance of permit by EHD 4 weeks <br /> Lead time for driller (1) (approximate) 3 weeks <br /> Install new wells MW-5 and MW-6 1 week <br /> Total Project Time (Includes RWQCB review time) 13 weeks <br /> (1) Assumes push-probe investigation shows that the northwest corner of the County property is an acceptable <br /> location for a permanent well. <br />
The URL can be used to link to this page
Your browser does not support the video tag.