My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 11:39:55 AM
Creation date
5/25/2021 11:23:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008-2009
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.3 WELL LOCATION <br /> The four new dual LFG extraction wells will be installed within the footprint <br /> of the landfill. Dual LFG extraction wells B-9 and C-13 will be installed near <br /> the western corner of the primary site (Figure 2). Dual LFG extraction wells <br /> H-15 and H-16 will be installed near the southwestern corner of the <br /> secondary site. Well locations may be adjusted due to site conditions. <br /> 2.0 EXECUTION <br /> 2.1 PERMITS <br /> Solid Waste Division (SWD) will obtain drilling permits from San Joaquin <br /> County Environmental Health Department (EHD). <br /> 2.2 INSPECTION <br /> SWD's contractor, on behalf of SW, will notify EHD Unit 6 lead inspector at <br /> least two (2) working days in advance for the first inspection. Consecutive <br /> required inspections for the project will be then be scheduled with EHD's <br /> inspector with a minimum of 24-hour notice. SWD's contractor will <br /> coordinate all inspections within EHD's inspection time from 9.00am to <br /> 4.00pm. <br /> Inspection notification will be made to EHD for the following work: <br /> • Well Installation <br /> • Abandoned boring backfill. <br /> 2.3 DRILLING <br /> The wells will be drilled by a licensed drilling Contractor. Depths of the new <br /> dual LFG extraction wells are above seasonal ground water table <br /> (Figure 5). The drill cuttings while drilling will mostly be refuse. Refuse and <br /> soil with refuse drilled out will be placed in a dumpster bin and then <br /> disposed off-site. A boring log will compiled during drilling. <br /> 2.4 WELL CONSTRUCTION <br /> It is anticipated that the dual LFG extraction wells will be constructed <br /> immediately after drilling. <br /> Work Plan—Dual LFG Extraction Well Installation San Joaquin County <br /> Harney Lane Sanitary Landfill Public Works Department <br /> Revised 11-18-09 2 Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.