Laserfiche WebLink
2" HDPE WELL CASING <br /> SLIP JOINT(NO GLUE) <br /> 3" X 2" SCH 80 PVC BUSHING <br /> GLUE JOINT 24 HRS BEFORE USE <br /> NOTE 1 <br /> REMOVE RIM ON REDUCER <br /> BUSHING INTERIOR <br /> 3" SCH 80 <br /> PVC COUPLING <br /> 8 SCREWS TO PREVENT <br /> CASING FROM PULLING <br /> THROUGH BUSHING. <br /> GLUE JOINT 24 HRS BEFORE USE (TYP) <br /> 3" PERFORATED PVC PIPE <br /> NOT <br /> 1: SCREWS SHALL NOT PENETRATE 4" CASING. <br /> 60' TAPER 2: 3x2 EXPANSION JOINT SAHLL BE LOCATED AND INSTALLED AS <br /> BOTTOM EDGE SHOWN IN FIGURE 5. <br /> DUAL LFG EXTRACTION WELL <br /> COUNTY OF SAN JOAQUIN NONE' INSTALLATION PROJECT 3"X 2"EXPANSION JOINT FIGURE 9 <br /> 01 Harney LaneOD ings\New Dual LFG Extraction Well 09.dwg HARNEY LANE LANDFILL Figure Revised 10-20-09 <br />