Laserfiche WebLink
COST SHEET <br /> PROJECT.- LANDFILL GAS EXTRACTION WELL INSTALLATION <br /> HARNEY LANE SANITARY LANDFILL <br /> Date: <br /> Company Name: <br /> Item Task Unit of Unit Estimated Extension <br /> No. Measure Cost Quantity Price <br /> 1 Mobilization/Demobilization Lump Sum 1 <br /> 2 Dual Landfill Gas Extraction Linear 486 <br /> Well Feet <br /> 3 3" Lateral Piping Linear 383 <br /> Feet <br /> 4 3" & 2" Lateral Piping LF 40 <br /> Combo <br /> 5 Valve Box Installation Each 4 <br /> 6 Header Connection Each 4 <br /> 7 Abandoned borings In Linear 60 <br /> Refuse Feet <br /> 8 Abandoned borings In Soil Linear 20 <br /> Feet <br /> TOTAL <br /> • Available to start: <br /> • Sub-Contractor(s): <br /> Submitted by: <br /> Signature: <br /> Direct all questions regarding this cost proposal to Joyesh Chandra at (209)468-3066 or <br /> ichandra()si ocL v org . <br /> San Joaquin County <br /> LFG Extraction Wells Public Works Department <br /> Harney Lane Sanitary Landfill ii Solid Waste Division <br />