D. Water for well construction is available on site. The Engineer will <br /> demonstrate the operation of the well pump. However, the Contractor shall <br /> bring drill rig's water tank full on the first day. <br /> 1 .05 MOBILIZATION/DEMOBILIZATION <br /> A. Mobilization shall include: <br /> 1. Delivery to the landfill site and work areas all necessary equipment, <br /> tools, materials and supplies in good working order. <br /> 2. Establish a work force sufficient to commence and sustain the scope <br /> of work. <br /> 3. Ensure proper operation and safety of drill rigs for the drilling location <br /> specified in the plans. The existing terrain indentified in the plans is <br /> approximate. The Contractor shall verify site conditions before <br /> submitting cost proposal. <br /> 4. Provide the driller's job foreman with a working cell phone. <br /> 5. Provide a container for the containment of refuse and debris. <br /> 6. Provide sanitary facilities for workers. <br /> B. Demobilization shall include: <br /> Removal from the landfill site and work areas all equipment, tools, surplus <br /> materials, supplies, all refuse, soil with refuse and debris generated by the <br /> work. Work shall be considered complete when all items mentioned <br /> above are removed to the satisfaction of the Engineer. <br /> 1.06 SUBMITTALS <br /> 1. Submit C-57 license verification. <br /> 2. Submit complete detailed well logs after well installation. <br /> 3. Submit completed State of California Department of Water Resources <br /> Well Completion Report within five workings days after the completion <br /> of the project. <br /> 4. Substitution for approved products. <br /> Construction Specifications San Joaquin County <br /> LFG Extraction Wells Public Works Department <br /> Harney Lane Sanitary Landfill 3 Solid Waste Division <br /> 10-30-09 <br />