My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 11:39:55 AM
Creation date
5/25/2021 11:23:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008-2009
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Water for well construction is available on site. The Engineer will <br /> demonstrate the operation of the well pump. However, the Contractor shall <br /> bring drill rig's water tank full on the first day. <br /> 1 .05 MOBILIZATION/DEMOBILIZATION <br /> A. Mobilization shall include: <br /> 1. Delivery to the landfill site and work areas all necessary equipment, <br /> tools, materials and supplies in good working order. <br /> 2. Establish a work force sufficient to commence and sustain the scope <br /> of work. <br /> 3. Ensure proper operation and safety of drill rigs for the drilling location <br /> specified in the plans. The existing terrain indentified in the plans is <br /> approximate. The Contractor shall verify site conditions before <br /> submitting cost proposal. <br /> 4. Provide the driller's job foreman with a working cell phone. <br /> 5. Provide a container for the containment of refuse and debris. <br /> 6. Provide sanitary facilities for workers. <br /> B. Demobilization shall include: <br /> Removal from the landfill site and work areas all equipment, tools, surplus <br /> materials, supplies, all refuse, soil with refuse and debris generated by the <br /> work. Work shall be considered complete when all items mentioned <br /> above are removed to the satisfaction of the Engineer. <br /> 1.06 SUBMITTALS <br /> 1. Submit C-57 license verification. <br /> 2. Submit complete detailed well logs after well installation. <br /> 3. Submit completed State of California Department of Water Resources <br /> Well Completion Report within five workings days after the completion <br /> of the project. <br /> 4. Substitution for approved products. <br /> Construction Specifications San Joaquin County <br /> LFG Extraction Wells Public Works Department <br /> Harney Lane Sanitary Landfill 3 Solid Waste Division <br /> 10-30-09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.