Laserfiche WebLink
Corrective Action Financial Assurance Estimate <br /> Harney Lane Sanitary Landfill <br /> San Joaquin County <br /> Revised September 30, 2008 <br /> INTRODUCTION <br /> Purpose <br /> The purpose of this report is to estimate the cost of corrective action at the Harney Lane <br /> Sanitary Landfill against a"reasonably foreseeable release" in accordance with Sections <br /> 20380(b) and 22220-22222 of Title 27, California Code of Regulations. The County will <br /> then demonstrate financial assurance for this cost. <br /> Revision Contents <br /> This revision incorporates the following: <br /> • Costs for installation of landfill gas (LFG) components of corrective action are <br /> based on a contractor bid received for similar work at the Corral Hollow Landfill. <br /> • Other corrective action costs are updated from the cost estimate submitted in 2007 <br /> by 2.7% in accordance with California Integrated Waste Management Board <br /> annual inflation factor. <br /> • Total corrective action costs are based on a 30-year corrective action period. <br /> Site Description <br /> The Harney Lane Sanitary Landfill is an unlined Class III disposal site located at 14750 <br /> East Harney Lane on a 127-acre parcel of which 94 acres received refuse fill (Figure 1). <br /> The landfill is owned and maintained by San Joaquin County. Waste discharge included <br /> commercial and household waste, construction/demolition waste, and agricultural waste. <br /> The landfill stopped receiving waste in 1991 and was closed in 1994. The site is <br /> bordered by agricultural land. <br /> Hydrogeology <br /> To a depth of approximately 80 feet, soil consists of unconsolidated silts, clays, and <br /> sands. The measured hydraulic conductivity of the native soil underlying the landfill <br /> ranges between 10-6 to 10-8 centimeters/second. <br /> Groundwater is first encountered approximately 120 below the ground surface. It is <br /> unconfined and fluctuates approximately 4 feet seasonally. Groundwater flow is toward <br /> Corrective Action Financial Assurance Cost Estimate 1 September 30,2008 <br /> Harney Lane Sanitary Landfill San Joaquin County Public Works Department <br />