My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 11:39:55 AM
Creation date
5/25/2021 11:23:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008-2009
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• These wells will be connected to the existing LFG header pipe through control <br /> valves. <br /> COST ESTIMATE <br /> The cost of the corrective action plan and the EMP includes engineering design, field <br /> investigations, construction and associated materials, permitting, and final reports. <br /> Permitting associated with the project will include RWQCB and SJC well drilling <br /> permits. <br /> Costs are "contractor based", i.e., based on construction by contractor, not by County <br /> staff. The cost for constructing the LFG components are based on a contractor bid <br /> received for similar work at the Corral Hollow Landfill in June 2008. Costs for other <br /> components were escalated from the original 2007 costs by applying the inflation factor <br /> supplied by the California Integrated Waste Management Board. <br /> The cost of constructing the corrective action plan and EMP, including engineering, <br /> during the 30-year corrective action period is approximately$470,000. The annual cost <br /> over the 30-year corrective action period, including construction, operation and <br /> maintenance is estimated to be $50,000 (Table 1). <br /> Corrective Action Financial Assurance Cost Estimate 4 September 30,2008 <br /> Harney Lane Sanitary Landfill San Joaquin County Public Works Department <br />
The URL can be used to link to this page
Your browser does not support the video tag.