• These wells will be connected to the existing LFG header pipe through control <br /> valves. <br /> COST ESTIMATE <br /> The cost of the corrective action plan and the EMP includes engineering design, field <br /> investigations, construction and associated materials, permitting, and final reports. <br /> Permitting associated with the project will include RWQCB and SJC well drilling <br /> permits. <br /> Costs are "contractor based", i.e., based on construction by contractor, not by County <br /> staff. The cost for constructing the LFG components are based on a contractor bid <br /> received for similar work at the Corral Hollow Landfill in June 2008. Costs for other <br /> components were escalated from the original 2007 costs by applying the inflation factor <br /> supplied by the California Integrated Waste Management Board. <br /> The cost of constructing the corrective action plan and EMP, including engineering, <br /> during the 30-year corrective action period is approximately$470,000. The annual cost <br /> over the 30-year corrective action period, including construction, operation and <br /> maintenance is estimated to be $50,000 (Table 1). <br /> Corrective Action Financial Assurance Cost Estimate 4 September 30,2008 <br /> Harney Lane Sanitary Landfill San Joaquin County Public Works Department <br />