Laserfiche WebLink
Map ID <br />Direction <br />Distance <br />Elevation <br />MAP FINDINGS <br />Site <br />EDR ID Number <br />Database(s) EPA ID Number <br />HUSKY CRANE INC (Continued) 1000273351 <br />Eval General Type: <br />to Compliance Certification form to the EHD with a statement <br />Eval Date: <br />documenting the corrective actions that have been or will be taken for <br />Violations Found: <br />each violation, and any supporting paperwork, within 30 days of <br />Eval Type: <br />receiving the completed inspection report. Starting September 1, 2018, <br />Eval Notes: <br />all in -office CERS help will be provided at EHD hourly rate ($152). To <br />schedule an appointme <br />Eval Division: <br />San Joaquin County Environmental Health <br />Eval Program: <br />HMRRP <br />Eval Source: <br />CERS <br />Eval General Type: <br />Compliance Evaluation Inspection <br />Eval Date: <br />05-21-2019 <br />Violations Found: <br />Yes <br />Eval Type: <br />Routine done by local agency <br />Eval Notes: <br />Complete and submit a copy of the Return to Compliance Certification <br />form to the EHD with a statement documenting the corrective actions <br />that have been or will be taken for each violation, and any supporting <br />paperwork, by June 20, 2019. Starting September 1, 2018, all in -office <br />CERS help will be provided at EHD hourly rate ($152). To schedule an <br />appointment, please call (209) 468-3420. <br />Eval Division: <br />San Joaquin County Environmental Health <br />Eval Program: <br />APSA <br />Eval Source: <br />CERS <br />Eval General Type: <br />Compliance Evaluation Inspection <br />Eval Date: <br />05-27-2016 <br />Violations Found: <br />Yes <br />Eval Type: <br />Routine done by local agency <br />Eval Notes: <br />An inspection checklist was provided to the facility operator on the <br />day of inspection. The EHD has written the complete report which <br />replaces the initial checklist. Complete and submit a copy of the <br />Return to Compliance Certification form to the EHD with a statement <br />documenting the corrective actions that have been or will be taken for <br />each violation, and any supporting paperwork, within 30 days of <br />receiving the complete inspection report. Note: The inventory and <br />secondary containment described in the SPCC Plan did not match those <br />found on site. According to Mr. Mario Bermudez and Mr. Darryl Prost, <br />the changes, which included removing tanks from service and relocating <br />tanks on site, all occurred within the past 3-5 months. Please be <br />aware that the Spill Prevention, Control, and Countermeasure (SPCC) <br />Plan must be amended when there is a change in the facility design, <br />construction, operation, or maintenance that materially affects its <br />potential for a discharge, 6 [Truncated] <br />Eval Division: <br />San Joaquin County Environmental Health <br />Eval Program: <br />APSA <br />Eval Source: <br />CERS <br />Eval General Type: <br />Compliance Evaluation Inspection <br />Eval Date: <br />05-27-2016 <br />Violations Found: <br />Yes <br />Eval Type: <br />Routine done by local agency <br />Eval Notes: <br />An inspection checklist was provided to the facility operator on the <br />day of inspection. The EHD has written the complete report which <br />replaces the initial checklist. Violations #102 and 301 were added. <br />Complete and submit a copy of the Return to Compliance Certification <br />form to the EHD with a statement documenting the corrective actions <br />that have been or will be taken for each violation, and any supporting <br />TC6327721.2s Page 387 <br />