Laserfiche WebLink
River City Petroleum L 4 - 29 January 200 <br /> qp <br /> Connell Motor Lift Truck <br /> Stockton, San Joaquin County <br /> 2) A pilot study workplan, detailing the ISCR injection, with a discussion of the <br /> stochiometry (chemical equations) of the HRC treatment and potential effects to the <br /> aquifer water quality from ISCR, is also due 11 April 2008. You may combine the two <br /> workplans due 11 April 2008 into one document. Contingent upon approval of the <br /> workplan, the pilot study will commence with fieldwork ending no later than <br /> 1 July 2008, and the pilot study ending no later than 31 December 2008 (six months <br /> duration). <br /> 3) A report of the pilot study and a workplan for the full-scale implementation of all <br /> approved CAP remedial technologies is due is due 1 March 2009. All CAP remediation <br /> technologies shall be in place and operational by 1 July 2009. <br /> If you have any questions, please contact me at (916) 464-4615 or by email at <br /> jbarton@waterboards.ca.gov. <br /> Games L.L. Barton. P.G. <br /> Engineering Geologist <br /> cc: Mr. Mark Owens, State Water Resources Control Board, UST Cleanup Fund, Sacramento <br /> Mr. Michael Infurna, San Joaquin County Environmental Health Services, Stockton <br /> Mr. William Little, Advanced GeoEnvironmental Inc., Stockton <br /> — Final Protocol for In Situ Bioremediation of Chlorinated Solvents using Edible Oil, <br /> U.S. Air Force, October 2007 <br />