My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2219
>
2900 - Site Mitigation Program
>
PR0508387
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2021 1:26:37 PM
Creation date
5/26/2021 11:23:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508387
PE
2960
FACILITY_ID
FA0008052
FACILITY_NAME
CONNELL MOTOR TRUCK
STREET_NUMBER
2219
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11736029
CURRENT_STATUS
01
SITE_LOCATION
2219 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> MONITORING AND REPORTING PROGRAM NO. R5-2005-XXXX <br /> FOR <br /> FORMER RIVER CITY PETROLEUM &FORMER CONNELL MOTOR LIFT TRUCK <br /> (AKA CONNELL TIRE), SAN JOAQUIN COUNTY <br /> The site is located at 2211 N. Wilson Way(formerly State Highway 99) in Stockton (Figure 1). <br /> River City Petroleum (RCP) previously operated a truck fueling station on the eastern side of the prop y <br /> next to Wilson Way, which is the location of the former underground storage tanks (USTs). Three U s <br /> were removed from the subject site in June 1998. RCP leased the property from Connell Tire. Records <br /> show that the truck fueling station began operations prior to 1940. Connell Motor Lift Truck (CMLT), <br /> a former forklift repair service, operated out of a warehouse adjacent to the former truck fueling station. <br /> -Connell Tire currently owns the property and uses the warehouse to store and repair tires. Connell Tire <br /> and former River City Petroleum are hereafter collectively identified as the Dischargers. <br /> Petroleum hydrocarbons, including 1,2-dichloroethane (1,2-DCA) detected in groundwater beneath th <br /> property, appear to be the result of releases from past operations of the fueling station. Stoddard Solve t <br /> detected in groundwater near a suspected dry well northwest of the warehouse appears to be related to a <br /> spill at the former forklift repair service. The releases appear to be commingled under the northwest <br /> corner of the warehouse. In 2003, the USTs site was transferred from San Joaquin County Environmental <br /> Health Department(SJCEHD) Local Oversight Program to the Regional Board. An Interim Soil Vapor <br /> Extraction (SVE)remediation system began operation in November 2004 at the USTs source area. The <br /> Dischargers are continuing to delineate the vertical and lateral extent of the petroleum hydrocarbons <br /> pollution in groundwater, prior to submitting a corrective action plan for remediation of the site. DepA <br /> groundwater is approximately 55 feet. There is a small supply well located 150 north of the groundw <br /> plume that is used by a tenant of Connell Tire, reportedly to wash cars for an auto body shop. This <br /> pollution impairs the beneficial use of this water resource. <br /> This Monitoring and Reporting Program (MRP) is issued pursuant to Section 13267 of the California <br /> Water Code and is necessary to delineate groundwater pollutant plumes and determine whether <br /> remediation efforts are effective. Existing data and information about the site show the presence of <br /> petroleum hydrocarbons and fuel additives emanating from the property under the control of the <br /> Dischargers, and resulting from the Dischargers' current or past operation. The Dischargers shall not <br /> implement any changes to this MRP unless and until a revised MRP is issued by the Executive Officer or <br /> until Regional Board staff approve those changes in writing. <br /> Prior to construction of any new groundwater monitoring or extraction wells, and prior to abandonment of <br /> any groundwater monitoring or extraction wells, the Dischargers shall submit plans and specifications to <br /> Regional Board staff for review and approval. Once installed, all new wells shall be added to the <br /> monitoring program and shall be sampled and analyzed according to the schedule below. <br /> GROUNDWATER MONITORING <br /> As shown on Figure 2, there are thirty seven groundwater monitoring wells, designated MW-1 through <br /> MW-37. Also, there is one groundwater extraction well (EW-1), two groundwater extraction observation <br /> wells (OW-1 and OW-2), twenty nine soil vapor extraction (SVE) wells (VW-IA through VW-15B) for <br /> the SVE remediation system, and one onsite water supply well. The groundwater monitoring program for <br />
The URL can be used to link to this page
Your browser does not support the video tag.