Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 91 dsl <br /> Are both vent and tank riser piping f Yes a Yes r Yes r- Yes <br /> secondarily contained? r' No r No No T No <br /> OPE Model oPw oPw oPw <br /> r- Shut off 91 Shut off r Shut off r Shut off <br /> Flow Flow Flow Flow <br /> r Restricts I- Restricts I" Restricts l Restricts <br /> What is the OPE response when activated? Flow Flow Flow Flow <br /> (Check all that apply) I- Audible Audible r Audible r Audible <br /> Alarm Alarm Alarm Alarm <br /> r Visual Visual f Visual F_ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping r Yes* r' Yes* r Yes* Yes* <br /> that may interfere with the OPE operation? No No No r No <br /> At what level in the tank is the OPE set to <br /> activate? (Inches from bottom of tank) 99.625 100.625 <br /> What is the percent capacity of the tank at <br /> 91.4 90.8 <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to Yes Yes r Yes r Yes <br /> respond when the stored substance reaches r No r No r No r No <br /> the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> r Pass r: Pass r. Pass r Pass <br /> OPE Inspection Results r: Fail r Fail r Fail Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> WAS NOT ABLE TO TEST REG. DO TO THE NIPPLE NOT BEING ABLE TO BE REMOVED. <br /> *Mark here if: <br /> I- Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br />