My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 9:58:45 AM
Creation date
5/26/2021 2:41:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
CHEVRON STATION #212470/2222
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 SO-7MLC PROCEDURE 13111dYY. *STEP 11 B: PUPARE DRILL AND BIT <br /> FOR 71 SO-700L►SEE PAGE E Confirm [fiat the-,tap do the 3116`drill Eft suppffed <br /> FM 71 S&TOOLC L SEE FACE 10 with the 7150-TOOLC is ki the correct position befo re <br /> drilling. The stop is factory installed at a distance be- <br /> Motc: 7%SQ-TOMCcw only be used with Ratable twee: 1-3116'to 1-214"f lam the tip with the 71 SO- <br /> overfill valves if mod hUrd its shown below, TOW. If the stop is not at the cormct po 5W*n R must <br /> befixed before drilling. <br /> _ <br /> CAU"DON: IF the drill stop Is rwt in dw proper loco- <br /> _ tion failure of a pressure dacep tak test may muk. <br /> + 71 S0-T00LC <br /> I , <br /> Add a T 0-24 UNC thread or slrnWr 1 <br /> to all three legs c4 the 7l SO- Tip to stop dtmenslon must <br /> TOOL C in the area Ovwn. Use set tie�-3/16'to 1-214' <br /> screws to secure tool to upper Pjs 16 <br /> n�be_ <br /> STEP 126: DFULL 14OLES <br /> 71 SO-TOOLC M6di %Mfl6ft&fcW TOWible Wit. With the inlet tube and 7150-TODLC in place,carefully <br /> drill a 3116"diamKet hole in The upper tube using the <br /> STEP 90: iMSERT 71 SO-TOOLC OM MIILET TUBE hole in the 71 SO-TOOLC as a guide. The drill stop is po- <br /> To InsWl the 71 SO-T001.0 (wld separately)over the sirioned so it will bottom out against the tool after the <br /> inlet whe,first loosen the thumb screw, so 6r tool can bit has drilled through the upper drop wbr<. li rhe slop <br /> pass fne*over the in let tube fla nge- Align the slot on b p"tioned wrung eithtr no hole will be drilled,or a <br /> the tLxA with the key on the inlet tube and insert the through hale cocild poteritially be drilled through the <br /> tool down. SaoFigwe 99 inlet tube. If no We is drilled mwrn to step 118 and <br /> Tool 510[ Flarrd[,yhren thumb strew check the stop dimensbr,. if a hole�s drilled through <br /> the inlet tube or ir►to the screw hole the as5embty is not <br /> CPO salyaaeable_ Drtl l (2)more holes in the two remaining <br /> guide holes. <br /> v <br /> Loo <br /> thumb <br /> e <br /> Tube <br /> key <br /> V a+*-.Shwvv aM r.h <br /> r <br /> STEP 108: TIGHTEN THE 71 SO-TOOLC nowe 12B <br /> Er4u f that the loo I seats flat agai nst t he top oP the inleT <br /> tube. To prevent vertical rnoverrtent of tate coal during <br /> drllling, hand tighten the thumb screw against the up- <br /> gcr drop tube. See lFigme IM <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.